My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1800
>
1600 - Food Program
>
PR0161429
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2020 8:38:14 AM
Creation date
2/28/2020 4:05:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161429
PE
1626
FACILITY_ID
FA0016565
FACILITY_NAME
MASALATINA
STREET_NUMBER
1800
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
953375183
APN
22205002
CURRENT_STATUS
01
SITE_LOCATION
1800 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REV. DATE BY <br /> 8/1/18 HV <br /> @ �2 <br /> �d <br /> �d <br /> C� GPs <br /> dye GPs ��� <br /> G <br /> < s/ <br /> ,P <br /> / <br /> \ GPS <br /> U (E)GAS <br /> METER �1 <br /> L-D <br /> V <br /> GPs � <br /> GPs <br /> LEIGAS GAS GA GAS EX. MkC <br /> f <br /> LL— <br /> EX.GAS GAS GAS GASAC <br /> 67 Lo <br /> 1-1/4"0 <br /> �S �� LD <br /> LD 1„ <br /> cpo G L <br /> LD <br /> 2 <br /> G C17— 3/4"O <br /> <a - 3/4"0 <br /> ` w <br /> LD <br /> LD <br /> \ L'i I / <br /> Q 1 II10 <br /> 1 <br /> \ \ w IIUJ <br /> W.H. @ 9 8 K BTU <br /> s_ EX. HV <br /> �d GAS GAS GAS GAS GAS - GAS GAS GAS GAS GAS GAS GAS GAS GAS G S GAS GAS GAS GAS GAS GAS GAS SAS GAS GAS <br /> SEPARATE <br /> GAS LINE APs GAS GAS [-�FOR R❑OFT❑P <br /> HVAC UNITS <br /> W <br /> oo <br /> Li <br /> PS <br /> Q °� o°oWo <br /> LD <br /> GP5 <br /> �i1 GAS LINE DROP <br /> H <br /> UNDER FLOOR <br /> (E)GAS TO EQUIPMENT EX. HVAC <br /> METER <br /> TOTAL GAS DEMAND = 856K BTU <br /> FURTHEST LENGTH = 150' <br /> W w M <br /> MIN, GAS PIPE REQUIRED = 2"0 <br /> 2" GAS LINE @ 125' MAX 928K BTU <br /> GAS LINE ISOMETRIC <br /> NOT TO SCALE \ <br /> PLUMBING PLAN w <br /> Scale 1/4" - F-0" <br /> o � <br /> c1n, <br /> Job: Commercial <br /> Drawn By: H.V. <br /> Date 8/1/18 <br /> APN #22-205-002 <br /> Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.