My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCUST
>
336
>
2900 - Site Mitigation Program
>
PR0523885
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 11:55:30 PM
Creation date
2/28/2020 4:31:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523885
PE
2957
FACILITY_ID
FA0005984
FACILITY_NAME
THATER PROPERTY
STREET_NUMBER
336
Direction
E
STREET_NAME
LOCUST
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04311105
CURRENT_STATUS
01
SITE_LOCATION
336 E LOCUST ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08 March 2005 <br /> AGE-NC Project No. 02-0962 <br /> Page 7 of 9 <br /> Following sample collection,each preserved sample sleeve will be labeled with the boring location, <br /> depth,time,date,and sampler's initials.Appropriately sealed and labeled samples will be placed in <br /> a chilled container and transported under chain of custody to a DHS-certified laboratory for analysis <br /> for the constituents listed in Section 3.2.. <br /> 4.2. WELL COMPLETION AND WELL ELEVATION SURVEY <br /> The three pilot soil borings will be completed as ground water monitoring wells utilizing 2-inch <br /> diameter, Schedule 40 PVC blank well casing and 0.020-inch slotted well screen installed from <br /> 40 feet to 60 feet bsg. After installing the well casing in each pilot boring, a filter pack material <br /> consisting of pre-washed#2/12 Lonestar sand will be added through the augers from total depth to <br /> approximately 2 feet above the screened interval. Following placement of the filter pack,the well <br /> will be surged to assist in settling the filter pack. Additional sand will be added if settling occurs. <br /> A nominal 2-foot bentonite chip seal will be placed above the filter pack to minimize the potential <br /> for grout penetration into the screened section of the wells. The bentonite seal will be formed by <br /> pouring bentonite chips into the annulus and allowing them to settle on the filter pack.The bentonite <br /> pellets will be allowed to hydrate for a minimum of hour prior to grouting. <br /> The remaining annular space will be filled to within 1 foot of the ground surface with a cement <br /> grout. The grout mixture will consist of Type I/II portland neat cement and not more than 6 gallons <br /> of water per 94-pound sack of cement.The grout will be placed by pumping through a tremie pipe. <br /> A grouting inspection will be scheduled with SJCEHD personnel. A proposed monitoring well <br /> construction diagram is depicted on Figure 3. <br /> Following completion of the monitoring wells,well elevations and locations will be surveyed by a <br /> California-licensed surveyor relative to a City of Lodi elevation benchmark. <br /> 4.3. WELL DEVELOPMENT <br /> Development of the proposed wells will consist of a combination of bailing with a stainless steel <br /> bailer to remove the major portion of fine-grained sediment from inside the well, surging to flush <br /> out or draw in sediment from the filter pack,and additional ground water evacuation with a Waterra <br /> inertia pump to finish the removal of fine-grained sediment. Developmental purging activities will <br /> be continued until field parameters(pH,electrical conductivity,and temperature)have stabilized and <br /> purged water is visually sediment-free. <br /> Advanced GcoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.