My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARKET
>
22
>
2800 - Aboveground Petroleum Storage Program
>
PR0527617
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 9:55:08 AM
Creation date
3/2/2020 9:00:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0527617
PE
2832
FACILITY_ID
FA0001506
FACILITY_NAME
STOCKTON POLICE DEPARTMENT
STREET_NUMBER
22
Direction
E
STREET_NAME
MARKET
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14904001
CURRENT_STATUS
01
SITE_LOCATION
22 E MARKET ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Compliance Standard <br /> Checked for the presence of water_ No water_ n Yes n No <br /> (SP001 6.10) <br /> Test alarm and equipment-Over fill by driver ❑X Yes n No <br /> (SP001 7.1.3) <br /> AST data plate on side of tank_ 0 Yes n No <br /> (SP001 7.1.4) <br /> AST checked against applicable standards: _Yes_ XX Yes n No <br /> (SP001 7.1.5) <br /> AST foundation inspection:-Yes- Fxj Yes [-] No <br /> (SP001 7.1.6) <br /> AST support inspection: _Yes_ ® Yes n No <br /> (SP001 7.1.7) <br /> Secondary containment and spill control: _UL 2085_ ® Yes ❑ No <br /> (SP001 7.1.8) <br /> General conditions around AST- <br /> OK_ X� Yes F-] No <br /> (SP001 7.1.8.1) <br /> Foreign materials around AST. _None_ ❑X Yes F-] No <br /> (SP001 7.1.8.2) <br /> Pipe supports: _No issues_ X❑ Yes 0 No <br /> (SPD01 7.1.9.1) <br /> Emergency vents & venting: _Installed to Industry Standards_ X Yes No <br /> (SP001 7.1.9.2) <br /> Primary tank gauge:_Stick port_ X❑Yes F No <br /> (SP001 7.1.9.3) <br /> Tank Overfill: _Over fill by driver_ X❑ Yes F-] No <br /> (SP001 7.1.9.5) <br /> 1 Bonding & grounding of AST-Yes- XO Yes ❑ No <br /> (SP001 7.1.10) <br /> Inspection for corrosion-No corrosion_ ® Yes [-� No <br /> (SP001 7.1.11) <br /> Inspection of paint coating on tank and supports-Yes- 0 Yes F-] No <br /> (SP001 7.1.12) <br /> Original steel thickness of tank: _14 Gauge Steel_ FX-] Yes [-] No <br /> (SP001 7.2.2) <br /> Check AST tank for UL standards:-UL 2085 tank Q Yes ❑ No <br /> (SPOO 1 7.2.3) <br /> UT thickness measurements around tank surface:-N/A Concrete_ ® Yes F] No <br /> (SP001 7.2.4) <br /> Inspect AST shell plate welds: _No defects_ FR] Yes F-] No <br /> (SP001 7.3.1) <br /> Take & record UTT readings: _N/A Concrete tank_ XX Yes No <br /> (SP001 7.3.1.1) <br /> External corrosion check: _No corrosion_ ® Yes ❑ No <br /> (SP001 7.3.1.2) <br /> Inspect shell attachments: _No attachments added_ FX� Yes F-] No <br /> (SP001 7.3.2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.