My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
9925
>
2900 - Site Mitigation Program
>
PR0526853
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 6:45:38 AM
Creation date
3/2/2020 10:34:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0526853
PE
2950
FACILITY_ID
FA0018185
FACILITY_NAME
PROPOSED PODESTA RANCH ELEM SCHOOL
STREET_NUMBER
9925
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
07014033
CURRENT_STATUS
01
SITE_LOCATION
9925 LOWER SACRAMENTO RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.6 Draft and Final PEA Reports <br /> The draft and final PEA Report will include at a minimum: background information, <br /> purpose of the investigation, an evaluation and discussion of findings in general <br /> accordance with DTSC PEA guidelines, a description of the soil types encountered, a site <br /> plan showing the boring locations, summary tables of laboratory test results, laboratory <br /> data sheets with QA/QC, chain of custody documentation, risk evaluation, any <br /> deviations, and conclusions and recommendations. The draft report will be submitted for <br /> DTSC review. The comments received from the DTSC will be incorporated into the final <br /> version of the PEA report. <br /> 7.0 ANTICIPATED SCHEDULE <br /> Public notice of the planned fieldwork will be initiated after approval of the workplan by <br /> the DTSC. Notification to DTSC will occur at least seven days in advance of any <br /> planned fieldwork. Fieldwork will begin approximately ten days (weather permitting) <br /> after approval of this work plan by the DTSC. The field activities outlined above can be <br /> completed in three weeks (weather permitting). Laboratory analyses, data analysis and <br /> report preparation typically require two to four weeks to complete. Additional deeper <br /> and step out samples will take two weeks to sample and two weeks for analysis. <br /> Assuming approval of this workplan by the DTSC by January 15, 2007 sampling should <br /> occur by February 1st,final data analysis completed by March 1st, and a report prepared <br /> by April 15, 2007. Prior to any fieldwork occurring at the Site, an electronic copy of the <br /> fieldwork notice that will be posted at the Site ten days prior to sampling will be sent to <br /> and approved by the DTSC. <br /> Preliminary Environmental Assessment Workplan <br /> Proposed Podesta Ranch Elementary School <br /> December 4,2006 <br /> Page 14 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.