My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
0
>
2900 - Site Mitigation Program
>
PR0506611
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:53:05 AM
Creation date
3/2/2020 10:43:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0506611
PE
2960
FACILITY_ID
FA0007538
FACILITY_NAME
HARTE DEHYRATOR STATION
STREET_NUMBER
0
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
LOWER SACRAMENTO RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA-EmArwrn*nhl Prc(w • <br /> .� PETE WILSON. Govrmai <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> 344 FkMXW Rob,"o A <br /> Racran00b,CA 96W-10W <br /> -40NE:M 6)M&MM <br /> 6)255-3015 <br /> 3 February 1997 <br /> Ms. Linda Gonsalves <br /> Pacific Gas and Electric Company <br /> 375 North Wiget Lane, Suite 13o FEB -- 5 1997 <br /> Walnut Creek, CA 94598-2412 I <br /> i✓ <br /> C0%1.MJNITY SERVICES DEPT. <br /> WORK PLAN TO CONDUCT PRELIMINARY SOIL ANrD GRO ` <br /> ELEVEN PACIFIC GAS AND ELECTRIC SITES THROUGHOUT THE CENTRAL V,ALLEy ONS, <br /> I have reviewed the December I996 Workplan to Perform Soil and Groundwater Preliminary <br /> Environmental Assessment at Eleven PG&E Gas Dehydrator Stations throughout the Central Valle}, <br /> area and the 30 January 1997 Addendum to the Work Plan. Figure I (attached) shows the locations of <br /> the 11 sites. The work plan describes the historical activities at each of the sitesand proposes to drill <br /> borings at each site in order to sample sod and groundwater. Temporary wells will be constructed or a <br /> hydropunch-type sampling device will be used to obtain grab groundwater samples at each boring <br /> location. Soil and groundwater will be analyzed for total petroleum hydrocarbons measured as gasoline.,1����; C <br /> and diesel, benzene, toluene, ethylbenzene, xylenes and glycol compounds. <br /> The work plan is hereby approved. In accordance with the proposed schedule, technical reports for the <br /> 11 sites will be submitted by 16 May 19917. Please provide at least 72 hours notice prior to field <br /> activities in case I wish to observe the field methods or obtain split samples. <br /> If you have any questions, you may call me at (916) 255-3077. <br /> oc�� <br /> EI. M. WEISS <br /> Associate Engineering Geologist <br /> JMW:jrnw/lsb <br /> Attachment <br /> cc: Glenn County Department of Environmental Health Services, Willows <br /> Sacramento County Department of Environmental Management, Hazardous Materials Division, <br /> Sacramento <br /> San Joaquin County Department of Public Health Services, Stock--ton <br /> Solaro County Department of Environmental IIealth Management, Fairfield <br /> Sutter County Department of Environmental Health , Yuba City <br /> Tchama County Department of Environmental Health, Red Bluff <br /> Yolo County Department of Environmental Services, Woodland <br />
The URL can be used to link to this page
Your browser does not support the video tag.