Laserfiche WebLink
TABLE OF CONTENTS <br />1.0 SOIL SUITABILITY STUDY 1 <br />1.1 INTRODUCTION AND DEVELOPMENT 1 <br />1.1.1 Description of Site, Including Zone Information 1 <br />1.1.2 Description of Proposed Development 1 <br />1.1.3 Parcel Vicinity Location Map 1 <br />1.1.4 Site Map Showing Location of All Items on Parcels (i.e., Structures, Drives, Wells, Septic <br />Systems, Large Trees, Pastures, Pools, Natural Drainage Courses, Ponds, Waterways, Etc.) 1 <br />1.2 PRESENT AND PAST USES OF THE SITE 2 <br />1.3 EXISTING AND PROPOSED SEPTIC TANK USAGE 2 <br />1.3.1 Existing On-Site Septic Tank Usage 2 <br />1.3.2 Site Septic Permit History 2 <br />1.3.3 On-Site Septic Tank Repair History 2 <br />1.3.4 Existing Septic Tank Usage in The General Area 2 <br />1.3.5 General Area Septic Permit History 3 <br />1.3.6 General Area Septic Tank Repair History 3 <br />1.3.7 Proposed or Expected Maximum Septic Tank Usage on Site 3 <br />1.4 GROUNDWATER INFORMATION 3 <br />1.4.1 Depth and Gradient of Groundwater in the General Area 3 <br />1.4.2 Existing and/or Potential Groundwater Contamination Issues in the General Location 4 <br />1.4.3 Location, Type and Construction of Well and Well Sample(s) 4 <br />1.4.4 Constituents Being Tested for in the Water Sample 4 <br />1.4.5 Sample Collection and Handling Methodology 4 <br />1.4.6 Chain of Custody Documentation 4 <br />1.5 SOIL PROFILE INFORMATION 5 <br />1.5.1 Site Map Showing Location, with Dimensions, of the Soil Profile Pit on the Parcel 5 <br />1.5.2 Description of Soil Profile Pit Including Depth and Dimensions 5 <br />1.5.3 Soil Lithology 5 <br />1.5.4 Discussion of Soil Lithology as Related to Future Onsite Septic Uses 5 <br />1.6 PERCOLATION TEST INFORMATION SECTION 5 <br />1.6.1 Site Map Showing the Location of the Percolation Test Holes 5 <br />1.6.2 Number of Shallow and Deep Percolation Tests was Performed for Each Parcel 6 <br />1.6.3 Description of the Date, Time and Protocol Used to Prepare the Test Hole 6 <br />1.6.4 Description of the Date, Time and Condition of the Test Hole After the 24-Hour Soak Period 6 <br />1.6.5 Compliance with SJC Policy EHD 02-02 6 <br />1.6.6 Percolation Test Form with REHS Verification Signature 6 <br />1.6.7 Discussion of Any Potential Problems Predicted and/or the Need for an Engineered or <br />Alternative Septic System 6 <br />1.6.8 Discussion of Percolation Rates in Relation to the Type, Size and Location of Future Leach <br />Fields Needed at the Site 6 <br />2.0 NITRATE LOADING STUDY 6 <br />2.1 CHEMICAL AND PHYSICAL PROPERTIES OF SOIL 7 <br />2.1.1 Chemical and Physical Properties of the Soils Underlying the Site 7 <br />2.1.2 Mass Transport Properties of the Soils Underlying the Site with Respect to Nitrate and/or any <br />Other Constituent of Concern Identified for the Project Site 7 <br />2.2 GROUNDWATER ANALYSIS 7 <br />2.2.1 Depth to Groundwater, Seasonal Fluctuations of Groundwater Depth, Directional Flow and <br />Gradient 7 <br />CONDOR