My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081715 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NILE
>
5700
>
2600 - Land Use Program
>
SR0081715 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 2:07:14 PM
Creation date
3/2/2020 10:49:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0081715
PE
2602
FACILITY_NAME
NILE GARDEN ELEMENTARY SCHOOL
STREET_NUMBER
5700
Direction
E
STREET_NAME
NILE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22607003
ENTERED_DATE
2/5/2020 12:00:00 AM
SITE_LOCATION
5700 E NILE AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />TABLE OF CONTENTS <br />1.0 SOIL SUITABILITY STUDY ........................................................................................................... 1 <br />1.1 INTRODUCTION AND DEVELOPMENT ...................................................................................... 1 <br />1.1.1 Description of Site, Including Zone Information ........................................................................... 1 <br />1.1.2 Description of Proposed Development ........................................................................................... 1 <br />1.1.3 Parcel Vicinity Location Map ........................................................................................................ 1 <br />1.1.4 Site Map Showing Location of All Items on Parcels (i.e., Structures, Drives, Wells, Septic <br />Systems, Large Trees, Pastures, Pools, Natural Drainage Courses, Ponds, Waterways, Etc.) ................ 1 <br />1.2 PRESENT AND PAST USES OF THE SITE .................................................................................... 2 <br />1.3 EXISTING AND PROPOSED SEPTIC TANK USAGE ................................................................... 2 <br />1.3.1 Existing On-Site Septic Tank Usage .............................................................................................. 2 <br />1.3.2 Site Septic Permit History .............................................................................................................. 2 <br />1.3.3 On-Site Septic Tank Repair History ............................................................................................... 2 <br />1.3.4 Existing Septic Tank Usage in The General Area .......................................................................... 2 <br />1.3.5 General Area Septic Permit History ............................................................................................... 3 <br />1.3.6 General Area Septic Tank Repair History ...................................................................................... 3 <br />1.3.7 Proposed or Expected Maximum Septic Tank Usage on Site ........................................................ 3 <br />1.4 GROUNDWATER INFORMATION ................................................................................................. 3 <br />1.4.1 Depth and Gradient of Groundwater in the General Area .............................................................. 3 <br />1.4.2 Existing and/or Potential Groundwater Contamination Issues in the General Location ................ 4 <br />1.4.3 Location, Type and Construction of Well and Well Sample(s) ..................................................... 4 <br />1.4.4 Constituents Being Tested for in the Water Sample ...................................................................... 4 <br />1.4.5 Sample Collection and Handling Methodology ............................................................................. 4 <br />1.4.6 Chain of Custody Documentation .................................................................................................. 4 <br />1.5 SOIL PROFILE INFORMATION ...................................................................................................... 5 <br />1.5.1 Site Map Showing Location, with Dimensions, of the Soil Profile Pit on the Parcel .................... 5 <br />1.5.2 Description of Soil Profile Pit Including Depth and Dimensions .................................................. 5 <br />1.5.3 Soil Lithology ................................................................................................................................. 5 <br />1.5.4 Discussion of Soil Lithology as Related to Future Onsite Septic Uses .......................................... 5 <br />1.6 PERCOLATION TEST INFORMATION SECTION ........................................................................ 5 <br />1.6.1 Site Map Showing the Location of the Percolation Test Holes ...................................................... 5 <br />1.6.2 Number of Shallow and Deep Percolation Tests was Performed for Each Parcel ......................... 6 <br />1.6.3 Description of the Date, Time and Protocol Used to Prepare the Test Hole .................................. 6 <br />1.6.4 Description of the Date, Time and Condition of the Test Hole After the 24-Hour Soak Period ... 6 <br />1.6.5 Compliance with SJC Policy EHD 02-02 ...................................................................................... 6 <br />1.6.6 Percolation Test Form with REHS Verification Signature ............................................................ 6 <br />1.6.7 Discussion of Any Potential Problems Predicted and/or the Need for an Engineered or <br />Alternative Septic System ........................................................................................................................ 6 <br />1.6.8 Discussion of Percolation Rates in Relation to the Type, Size and Location of Future Leach <br />Fields Needed at the Site ......................................................................................................................... 6 <br />2.0 NITRATE LOADING STUDY .......................................................................................................... 6 <br />2.1 CHEMICAL AND PHYSICAL PROPERTIES OF SOIL ................................................................. 7 <br />2.1.1 Chemical and Physical Properties of the Soils Underlying the Site ............................................... 7 <br />2.1.2 Mass Transport Properties of the Soils Underlying the Site with Respect to Nitrate and/or any <br />Other Constituent of Concern Identified for the Project Site .................................................................. 7 <br />2.2 GROUNDWATER ANALYSIS ......................................................................................................... 7 <br />2.2.1 Depth to Groundwater, Seasonal Fluctuations of Groundwater Depth, Directional Flow and <br />Gradient 7
The URL can be used to link to this page
Your browser does not support the video tag.