Laserfiche WebLink
SECTION IV. ADDRESS FOR CORRESPONDENCE <br />IL1_1 Facility Operator Mailing Address (Section II) ]%�l Facility Mailing Address (Section 111. B.) 11 Both <br />SECTION V. BILLING ADDRESS INFORMATION <br />SEND BILL TO: <br />( ]Facility Operator Mailing Address (Section 11) (]Facility Mailing Address (Section III, B.) ( ]Other (enter information below) <br />Name: <br />Phone <br />Mailing Address: <br />1 1 1 1 1 1 1 <br />1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 <br />City <br />Slate: <br />Zip Code. <br />Contact Person: <br />I I I I I I <br />I I I I I! I I I I I I I I I I I I I I I I I I I <br />SECTION VI. RECEIVING WATER INFORMATION <br />Your facility's storm water discharges flow: (check one) ( ) Directly <br />Name of receiving water <br />OR <br />K Indirectly to waters of the United States. <br />(river, take, stream, ocean, etc.) <br />SECTION VII. IMPLEMENTATION OF PERMIT REQUIREMENTS <br />A. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) (check one) <br />( ) A SWPPP has been prepared for this facility and is available for review. <br />k'A SWPPP will be prepared and ready for review by (enter date): <br />B. MONITORING PROGRAM (check one) <br />I I A Monitoring Program has been prepared for this facility and is available for review. / <br />Q,dA Monitoring Program will be prepared and ready for review by (enter date): jQ/_/�. <br />C. PERMIT COMPLIANCE RESPONSIBILITY <br />Has a person been assigned responsibility for: <br />1. Inspecting the facility throughout the year to identify any potential pollution preblP.ms?............................................................. ✓YES NO <br />2. Collecting storm water samples and having them analyzed?............................................................. ............... ..........................-7YES _NO <br />3. Preparing and submitting an annual report by July 1 of each year?............................................................................................�--YES ,NO <br />d. Eliminating discharges other than storm water (such as equipment or vehicle wash -water) into the storm drain? ...................... ✓ YES NO <br />SECTION VI11. REGULATORY STATUS (Go to Section 1X i1 not applicable) p <br />A. WASTE DISCHARGE REQUIREMENT ORDER NUMBER: I I I 1 1 1 11 B. NPDEE PERMIT CA I I I I I I I I <br />SECTION IX. SITE MAP <br />I HAVE ENCLOSED A SITE MAP YES(Y A new NOI submitted without a site map will b: rejected. <br />SECTION X. CERTIFICATION <br />"I certify under penalty of law that this document and all attachments were prepared under my direction a id supervision in accordance with a system <br />designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who <br />manage the system, or those persons directly responsible for gathering the information, the information sibmitted is, to the best of my knowledge and <br />belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and <br />imprisonment. In addition, I certify that the provisions of the permit, including the development and implementation of a Storm Water Pollution Prevention <br />Plan and a Monitoring Program Plan, will be complied with." <br />Printed Name: <br />Signature <br />Title: <br />Cate <br />