Laserfiche WebLink
Document <br />Page 1 of 1 <br />(d) Notwithstanding subsections (a) and (c) of this section and section 66262.35, a generator of less <br />than 1,000 kilograms of hazardous waste in any calendar month who accumulates hazardous waste <br />onsite for 180 days or less, or 270 days or less if the generator transports the generator's own waste, <br />or offers the generator's waste for transportation, over a distance of 200 miles or more, for offsite <br />treatment, storage, or disposal, is not a storage facility if all of the following apply: <br />(1) The quantity of hazardous waste accumulated onsite never exceeds 6,000 kilograms. <br />(2) The generator complies with the requirements of subdivisions (d), (e) and (f) of section <br />262.34 of Title 40 of the Code of Federal Regulations. <br />(3) The generator does not hold acutely hazardous waste or extremely hazardous waste in an <br />amount greater than one kilogram for more than 90 days. <br />(e)(1) A generator may accumulate as much as 55 gallons of hazardous waste, one quart of <br />acutely hazardous waste (listed in section 66261.33(e)) or one quart of extremely hazardous <br />waste at or near any point of generation, without a permit or grant of interim status, without <br />complying with subsections (a), (b) and (c) of this section, if all of the following requirements <br />are met with respect to this waste: <br />(A) the waste is accumulated in containers, other than tanks, at the initial accumulation point <br />which is at or near the area where the waste is generated and which is under the control of the <br />operator of the process generating the waste; <br />(B) the generator does not hold the waste onsite for more than one year from the initial date of <br />accumulation, or for longer than the applicable accumulation period specified in subdivision (a) <br />or (d), whichever occurs first. For purposes of this subdivision, the applicable accumulation <br />period specified in subdivision (a) or (d) shall start on the date the quantity limitation specified <br />in paragraph 1 of subsection (e) of this section is reached: <br />(C) the initial date of waste accumulation is clearly marked and visible for inspection on each <br />container used for accumulation of hazardous waste; <br />(D) the generator complies with sections 66265.171, 66265.172, and 66265.173(a) of this <br />division; and <br />(E) the generator complies with subsections (e)(2), (e)(3) and (f)(3) of this section. <br />(2) Except as provided in subsections (e)(2)(A) and (e)(2)(B) of this section, a process or group <br />of processes meeting the requirements of subsection (e)(1) of this section, shall be subject to a <br />single 55 gallon or one quart accumulation limit for that process or group of processes. <br />./om_isapi.dll?clientlD=7672539li&hitsperhead1n- on&infobase=ccr&record={B7F3B)&so <br />