Laserfiche WebLink
k'■ KLEINFELDER <br /> A-2.3 Collection of Soil Samples <br /> Soil samples are collected approximately every 5 feet for field screening and logging. Samples <br /> are collected by advancing the boring to a point immediately above the desired sampling depth <br /> and then driving(vertical borings) or pushing(slant borings) a Modified California Sampler, lined <br /> with three brass tubes, into the undisturbed soil. The sampler is then removed from the bottom of <br /> the boring. The ends of the bottom (third) tube are covered with Teflon and sealed with tight <br /> fitting plastic caps. <br /> Each sample is individually labeled. The label includes Kleinfelder's name, job number, the date <br /> and time the sample was collected, the employee number of the individual who performed the <br /> sampling, and a unique five-digit sample identification number. A custody seal may be placed on <br /> the sample in such a way that any attempt to tamper with the sample is easily visible. <br /> A-2.4 Sample Handling <br /> After labeling, the sample is immediately stored in an iced cooler for transport to Kleinfelder's <br /> office sample control or to the analytical laboratory. A Kleinfelder chain-of-custody form <br /> accompanies the cooler. The chain-of-custody form includes Kleinfelder's name, address, and <br /> telephone number, the employee number of the individual who performed the sampling, the <br /> sample numbers, the date and time the samples were collected, the number of containers each <br /> sample occupies, and the analyses for which the samples are being submitted, if any. When the <br /> samples are delivered, the chain-of-custody form is signed by each person who handles the <br /> samples, including all Kleinfelder employees and the receiving employee of office sample control <br /> or the analytical laboratory. <br /> A-2.5 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are steam <br /> cleaned prior to drilling each boring. In addition, sampling equipment is cleaned with a <br /> trisodium-phosphate or laboratory detergent wash and rinsed with distilled water prior to <br /> collecting each soil sample. <br /> A-2.6 Soil Cutting Disposal <br /> Drill cuttings are placed in 55-gallon drums or on top of and covered by polyvisquene for storage. <br /> The soil is left on site for disposal by the site owner. If requested, Kleinfelder can coordinate <br /> disposal of soil and water after analytical results are available. <br /> 20-2245-32.E01/2017R720 Page A-2 <br /> © 1997, Kleinfelder, Inc. November 18, 1997 <br />