My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2025
>
2900 - Site Mitigation Program
>
PR0507203
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2020 8:49:04 PM
Creation date
3/2/2020 2:04:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0507203
PE
2950
FACILITY_ID
FA0007734
FACILITY_NAME
LAKESPUR ESTATES (PROPOSED)
STREET_NUMBER
2025
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
2025 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k'q KLEINFELDER <br /> 3. Water level measurements are made using a conductivity-based water-level meter. <br /> Depth-to-water is generally measured from a surveyed mark on the north rim of the PVC <br /> well casing. <br /> The water level measurements are converted to elevations using the surveyed casing elevations. <br /> A4.2 Groundwater Sampling <br /> Groundwater samples are collected from the monitoring wells at the site. The sampling protocol <br /> for each well is as follows: <br /> 1. Down-well equipment (pumps, bailers, etc.) is decontaminated by steam cleaning, or by <br /> scrubbing in a trisodium-phosphate wash followed by a distilled water rinse, prior to use <br /> in each well. Bailer cord is replaced prior to use in each well. <br /> 2. The depth-to-water is measured using a conductivity-based water-level meter. <br /> I The volume of water standing in the well is calculated by subtracting the depth-to-water <br /> measurement from the depth of the well and multiplying by the appropriate conversion <br /> factor(3.14 *radius'). <br /> 4. Three to five well volumes of water are purged from each well using a submersible <br /> pump, bladder pump,or Teflon bailer. <br /> S. Physical parameters (pH, electrical conductivity, and temperature) are monitored for <br /> stability during purging. The physical parameter measurements are recorded on purge- <br /> and-sample logs, along with the time and volume of water purged at each measurement. <br /> 6. Samples are collected with a disposable bailer or bladder pump into appropriately <br /> prepared bottles provided by the analytical laboratory. <br /> 7. Samples for metals analysis are usually filtered in the field at the time of collection. <br /> 8. Samples are immediately labeled and placed in an iced sample container. At the end of <br /> the day, the samples are delivered to the analytical laboratory under chain-of-custody <br /> control. Sample handling is described in more detail in Section A-2.4. <br /> 20-2245-32.E01/2017R720 Page A-5 <br /> © 1997,Kleinfelder,Inc. November 18, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.