My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_COMPLIANCE INFO 1983-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
1085
>
2900 - Site Mitigation Program
>
PR0545446
>
COMPLIANCE INFO_COMPLIANCE INFO 1983-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 12:47:13 PM
Creation date
3/3/2020 12:21:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
COMPLIANCE INFO 1983-2007
RECORD_ID
PR0545446
PE
2961
FACILITY_ID
FA0019341
FACILITY_NAME
GORDON PROPERTY
STREET_NUMBER
1085
Direction
S
STREET_NAME
UNION
STREET_TYPE
RD
City
MANTECA
Zip
95337
CURRENT_STATUS
02
SITE_LOCATION
1085 S UNION RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California, with expertise in hazardous substance site cleanups. Respondent shall <br /> promptly notify DTSC of any change in the identity of the Project Engineer/Geologist. <br /> Respondent shall obtain approval from DTSC before the new Project Engineer/Geologist <br /> performs any work under this Order. <br /> 6.3 Monthly Summary Reports. Within thirty (30) days from the date this <br /> Order is signed by DTSC, and on a monthly basis thereafter, Respondent shall submit a <br /> Monthly Summary Report of its activities under the provisions of this Order. All of the <br /> activities reported shall include the date(s) on which actions occurred or are scheduled to <br /> occur. The report shall be received by DTSC by the fifteenth (15`h) day of each month <br /> and shall describe: <br /> 6.3.1 Specific actions taken, and the date(s) on which they occurred, by or on <br /> behalf of Respondent during the previous calendar month; <br /> 6.3.2 Actions expected to be undertaken during the current calendar month; <br /> 6.3.3 All planned activities for the next month; <br /> 6.3.4 Any requirements under this Order that were not completed and a <br /> projected date by which the required activity/task will be completed; <br /> 6.3.5 Any problems or anticipated problems in complying with this Order; and <br /> 6.3.6 All results of sample analyses, tests, and other data generated under <br /> this Order during the previous calendar month, and any significant findings from these <br /> data. <br /> 6.4 Quality Assurance/Quality Control (QA/QC). All sampling and analysis <br /> conducted by Respondent under this Order shall be performed in accordance with <br /> QA/QC procedures approved by DTSC pursuant to this Order. <br /> Page 16 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.