Laserfiche WebLink
t <br /> SITE CHARACTERIZATION <br /> A Preliminary Site Characterization Workplan to investigate soil conditions at the site was <br /> submitted by AEMC on May 20, 1991. This workplan proposed the installation of borings B-1 <br /> through B-3 to depths of approximately 30 feet bgs to determine the vertical and horizontal <br /> V <br /> extent of petroleum constituents in soil. Homestead had the tank excavations backfilled in May <br /> Fj1991 with soil excavated during removal of the tanks to provide access for exploratory <br /> equipment and for personnel safety. The activities described in the workplan were implemented <br /> on June 18 and June 24, 1991. The description of those activities and the results of the <br /> F! investigation were presented in the Phase II Investigation and Evaluation Report of August 29, <br /> F� 1991, by AEMC. Analytical results are presented in Table 4, below. Laboratory reports are <br /> included in the Phase II Investigation and Evaluation Report, which is included as Appendix D. <br /> i <br /> r. <br /> a <br /> a <br /> r <br /> l� <br /> ti-maix. t 12 nccemtwf ii.1992 <br /> h � m <br /> E <br />