Laserfiche WebLink
' 2-10 <br /> It was not possible to gain access to either of the water supply wells for water-level measure- <br /> ments or sampling A water sample was collected from the bolding tank spigot, which was <br /> ' understood to be the closest access point This sample was analyzed for TCL VOCs, total <br /> (unfiltered) RCRA metals, hexavalent chromium, and ammonia (Table 3) <br /> ' 2 7 GROUNDWATER FLOW <br /> Ground water levels were measured at each existing monitoring well on August 10 and <br /> August 26, 1994 to evaluate the ground water flow direction Ground water levels are <br /> summarized in Table 4, and the ground elevations measured on August 26, 1994 were used <br /> ' to prepare a ground water contour map (Figure 4) <br /> f' <br /> 29025 <br /> r I � <br /> ' "REALISTIC SOLUTIONS FOR HAZARDOUS WASTE PROBLEMS" <br />