Laserfiche WebLink
' 5-2 <br /> The SCW should be approved by the Local Implementing Agency (LIA) and the Central <br /> Valley Regional Water Quality Control Board (RWQCB) prior to commencement of any <br /> additional investigation <br /> i <br /> 5 2 REMEDIATION <br /> Based on the results of the additional investigation, a Final Remediation Plan (FRP)/Correc- <br /> tive Action Plan should be developed for the remediation of soil impacted with BTEX con- <br /> stituents and TPH-purgeable fuels as gasoline in the Former UFT Area and any ground water <br /> impacted with BTEX constituents, TPH-purgeable fuels as gasoline, and lead and chromium <br /> (if necessary) <br /> 1 <br /> sW25 <br /> i <br /> ' "REALISTIC SOLUTIONS FOR HAZARDOUS WASTE PROBLEMS <br />