My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
501
>
2900 - Site Mitigation Program
>
PR0505714
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 9:10:24 AM
Creation date
3/4/2020 9:05:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505714
PE
2950
FACILITY_ID
FA0003590
FACILITY_NAME
M B P
STREET_NUMBER
501
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03731045
CURRENT_STATUS
02
SITE_LOCATION
501 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHRONOLOGY <br /> 501 W. LODI AVE., LODI <br /> LOP SITE CODE: 505714 <br /> APN: 03731045 <br /> CVRWQCB CASE# 390899 <br /> 06/13/95 EHD received a permit application for the installation of 2 MWs on site. <br /> 07/05/95 EHD witnessed installation of 2 MWs-by Clearwater Environmental. <br /> 11/14/95 Date EHD received MW Installation Report which evidenced ground <br /> water contamination. MW 1 and MW2 both impacted with: TPHG, <br /> BTEX, and fuel oxygenates. <br /> 11/28/95 EHD files Prop. 65 and Unauthorized Release Report and the site was <br /> placed in LOP for further assessment. <br /> 03/13/97 Date EHD received notification from Cleanup Fund that the site had <br /> submitted a claim application for investigation and cleanup cost <br /> reimbursement. <br /> 02/05/48 Site was posted for the Public Participation Period. <br /> 02/12/98 3110,000 gallon gasoline USTs were removed under EHD permit and <br /> inspection. Soil samples ,were collected for analyses from beneath the <br /> USTs, piping and dispensers. <br /> 09/28/98 EHD approved WP submitted by AGE to install additional MWs and soil <br /> borings. <br /> 10/30/98 3-additional MWs (3,4, and 5) were installed on site. <br /> 02/04/99 EHD received QMR prepared by AGE. Report contained information for <br /> work completed 10/30/98 including two vapor extraction wells. <br /> 05/10/99 Date EHD approved WP to perform a soil vapor extraction test. <br /> 05/12/99 Date of an 8 hour SVE test by AGE. <br /> f <br /> 08/23/99 EHD approved CAP for soil vapor extraction and air sparging. <br /> 05/19/00 AGE completed the installation of additional vapor and air sparging wells. <br /> 07/17/00 Date SVE and IAS began; CAP was implemented. <br /> E <br /> .w . <br />
The URL can be used to link to this page
Your browser does not support the video tag.