My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
501
>
2900 - Site Mitigation Program
>
PR0505714
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 9:10:24 AM
Creation date
3/4/2020 9:05:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505714
PE
2950
FACILITY_ID
FA0003590
FACILITY_NAME
M B P
STREET_NUMBER
501
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03731045
CURRENT_STATUS
02
SITE_LOCATION
501 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPART <br /> MENT <br /> ' W <br /> SAN JOAQUIN COUNTY <br /> a.. = <br /> z ?� Donna K.Heran,R.E.H.S. Unit Supervisors <br /> W ,.� 5 " Director 304 East Weber Avenue, Third Floor Carl Borgman,R.EM.S. <br /> • Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> • cc' -'c Program Manager Douglas W.Wilson,R.E.H.S. <br /> 4CfO`R�� <br /> Laurie A.Cotuila,R.E.H.S. Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S.Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> MBP/MEL BOKIDES PETROLEUM <br /> NICHOLAS. BOKIDES <br /> 521 W PINE STREET. <br /> LODI CA. 95242 <br /> 1 <br /> RE: 501 W. Lodi Ave Site Code:505714 <br /> Lodi, Ca. <br /> WORK PLAN: Remedial Action Confirmation Sampling <br /> DATED: April 9,2003 <br /> PREPARED BY: AGE <br /> APPROVED: [X] <br /> DISAPPROVED: [ ] <br /> ADDENDUM NEEDED: [ ] Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25299.37 (c)(3)]: <br /> 1. To perform off site groundwater sampling down-gradient of the gasolineldiesel release area. <br /> The site has undergone corrective action/soil vapor extraction and in-situ groundwater air <br /> sparing. The groundwater sampling will define the down-gradient,lateral extent of dissolved <br /> contamination that may have migrated off site. <br /> 2. Two borings will be completed down-gradient and two water samples will be collected at <br /> approximately 50-60 feet below ground surface. <br /> 3. The water samples will be analyzed for TPN-G,TEPH-D, BTEX,and fuel additives using EPA <br /> methods 8015 modified,8020,and 8260b. <br /> 4. A report of finding will be submitted to EHD and CVRWQCB within 90 days of sampling. <br /> S. If groundwater contamination is evidenced off site additional MW may be required. i <br /> I <br /> COMMENTS AND CONDITIONS: <br /> 1. A well permit application and fees must to submitted to EHD. <br /> .2. An EHD permit must to procured and 'inspections scheduled prior to beginning work. <br /> 3. All required City Of Lodi permits must to obtained prior to scheduling proposed work. <br /> 4. Cleanup Fund preapproval must to obtained for cost associated with all work. <br /> DATED ��) BY [� _ <br /> Harlin Knoll, Senior REHS(2091.468-3442 <br /> Cc: AGE <br /> CVRWQCB-James Barton <br />
The URL can be used to link to this page
Your browser does not support the video tag.