My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
501
>
2900 - Site Mitigation Program
>
PR0505714
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 9:09:03 AM
Creation date
3/4/2020 9:06:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505714
PE
2950
FACILITY_ID
FA0003590
FACILITY_NAME
M B P
STREET_NUMBER
501
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03731045
CURRENT_STATUS
02
SITE_LOCATION
501 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C4/19/2000 11:16 2a94671" 9 AGE STOCKTON PAGE 02 <br /> Advanced <br /> GeoEnvxronmental, Inc . <br /> 19 April 2000 <br /> AGE-NC Project No. 98-0450 <br /> Mr, Mike Infuma <br /> SAM JOAQUIN COUNTY PHS-EHD <br /> 304 East Weber Avenue <br /> Stockton, CA 95202 <br /> Subject: Corrective Action Schedule <br /> Mel Hok+des Petroleum <br /> 501 West Lodi Avenue, Lodi, California <br /> Dear Mr_ Infurna: <br /> At your request,from our 19 April 2000 phone conversation and at the request of Mr.Nick Bokides, <br /> Adl,anced GeoEnvironmental, Inc. (AGE)has prepared this schedule of corrective action milestone <br /> for the site at 501 West Lodi Avenue In Lodi, California. The work plan detailing the corrective <br /> action dated 27 March 2000, has the scope for the following time line. <br /> • Application for a permit to construct and operate a soil vapor extraction unit with the San <br /> Joaquirn Valley Unified Air Pollution Control District (APCD) on site is proposed for the <br /> final week of April 2000 (anticipated one-month permit-process duration), <br /> • Installation of remediation system pad,enclosure and power supply is proposed for the first <br /> week of May 2000, <br /> • installation of remediation wells is proposed for the second week of May 2000 (pending <br /> approval of work plan), <br /> • Completion of the re11x>e.diation network is proposed for the third week of May 2000, <br /> • Delivery of the soil vapor extraction and air-spaiIn- system thrid arid/or final week of May <br /> or the first week of Tune 2000, <br /> • Initiation of corrective action for the first geek of June 2000. <br /> • Confirrnation/progress soil sampling will likely occur during in.December 2000 and/or Jure <br /> of 2001. Quarterly ground monitoring and monthly system monitoring will occur as required <br /> under code and.permit. <br /> 4005 NoNh N'Vilson Way. Stnckion. CaGforni�i 95205 <br /> Telephonc:(2091 c167-1006 FAX l2 9y 467-11 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.