My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012432
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
501
>
2900 - Site Mitigation Program
>
PR0505714
>
ARCHIVED REPORTS_XR0012432
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 11:45:32 AM
Creation date
3/4/2020 9:15:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012432
RECORD_ID
PR0505714
PE
2950
FACILITY_ID
FA0003590
FACILITY_NAME
M B P
STREET_NUMBER
501
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03731045
CURRENT_STATUS
02
SITE_LOCATION
501 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f ' <br /> ' TABLE 7 <br /> CORRECTIVE ACTION OPTIONS <br /> ' Mel Bokldes Petroleum - 501 West Lodi Avenue Lodi, California <br /> Method Advantages Disadvantages Estimated Costs(incl <br /> tMonitoring and <br /> Maintenance) <br /> ' In-situ Soil Vapor • Easily combined with Greater than 90% $40,000 to$75,000 <br /> Extraction other methods(i a IAS)• reduction of annually <br /> Readily available contaminants generally <br /> equipment•Conducive not attainable • Large <br /> ' site conditions• initial equipment cost- <br /> Relatively rapid cleanup Supplemental fuel <br /> period(18 to 24 months) required and costs can be <br /> ' • Can cleanup excessive as <br /> contaminated soil under contaminants decrease <br /> structures Air permitting required- <br /> Only non-saturated soils <br /> cleaned up <br /> Excavation • Theoretical removal of - Cost-effectiveness Could exceed$90,000 for <br /> ' 100%of contaminants • decreases with depth of excavation,treatment <br /> Relatively short contamination • Cannot and/or disposal could <br /> remediation period cleanup under structures• exceed $250,000 <br /> After removal,excavated <br /> soil must be treated or <br /> disposed• Backfill <br /> ' material and compaction <br /> costs can be excessive <br /> In-situ Bioremediation • Relatively simple • Regulatory approval can $60,000 to <br /> ' (Soil) design and operation • be difficult to obtain • $110,000 total cost <br /> Short treatment period, Additional inoculations <br /> usually 12 to 24 months• sometimes necessary- <br /> ' Works well in most soil Nutrient addition <br /> types where no sometimes necessary <br /> biotoxicity is present Not effective in soils with <br /> high concentrations of <br /> hydrocarbons <br />' In-situ Air Sparging - Cleanup technique • Initial equipment/design $25,000 to$50,000, <br /> compatible with site costs can be costly• annually depending upon <br /> conditions• Combines capitol treatment period <br /> well with SVE• Readily <br /> available equipment• y <br /> Site conditions are <br />' conducive for]AS <br /> treatment -Little <br /> equipment maintenance <br /> I0 required <br /> Advanced GeoEnviron mental,Inc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.