' Project Mel Bokides Petroleum - Lodi Project No 98-0450 BORING NO.
<br /> Site Address 501 West Lodi Aveneue Total Depth 40 feet SB5
<br />' Lodi, California Date 30 October 1998 VW-1
<br /> II:illing Co Soils Exploration Services Logged by Little Page 1 of 2
<br /> R19—/Auger Type CME 7518" hollow stem Reviewed by Henderson
<br /> O���bL�� o�o��t�l�`'GG� S � Q,vo� Lithologic Descript3on
<br /> 1
<br /> —
<br /> CL
<br /> IBI-1 1 4,5,6 Tan, firm,moist,silty CLAY, slight hydrocarbon(HC)odor
<br /> CL
<br /> 10— SB5-10 476 21,23,24 Brown, very stiff,moist,silty CLAY, intense HC odor
<br />' CL
<br /> S111-15 6298 21,16,14 Tan, very stiff,moist, silty CLAY,very intense HC odor
<br /> t
<br /> CL
<br /> 20— SB5-20 2383 9,17,23 Brown,stiff,moist, silty CLAY, very intense HC odor
<br /> CL
<br />' —
<br /> SBI-21 4650 9,18,22 Brown, stiff,moist, silty CLAY, very intense HC odor
<br /> —
<br /> 30— SB5-30 375 6,15,12 CL Gray, firm to stiff, moist, silty CLAY, intense HC odor
<br /> CL
<br />' — SB5-35 180 4,18,26 Gray blue, firm to stiff,moist,silty CLAY, intense HC odor
<br /> —
<br /> 40— SB5-40 68 9,16,23 SM Tan, medium dense,moist, silty SAND,slight HC odor
<br /> Advanced
<br /> GeoEnvironmental, Inc.
<br /> L L4hAIP1201B0131NG-4YMBP LODIISBS SAM 01!25!99 C 10 13 AM
<br />
|