' Project Mel Bokides Petroleum - Lodi Project No 98-0450
<br /> 1 BORING NO
<br /> ' Site Address 501 West Lodi Aveneue Total Depth 40 feet SB5
<br /> Lodi, California Date 30 October 1998
<br /> VW-1
<br /> Drilling Co Soils Exploration Services Logged by Little Page 1 of 2
<br /> Rig/Auger Type CME 75/8" hollow stem Reviewed by Henderson
<br /> �Q�`a �G ° Litholo is Description
<br /> G
<br /> CL
<br /> – SB5-5 1 4,5,6 Tan,firm,moist, silty CLAY,slight hydrocarbon(HC)odor
<br /> '
<br /> 10— SB5-10 476 21,23,24 CL Brown, very stiff,moist,silty CLAY, intense HC odor
<br /> CL
<br /> – SB5-15 6298 21,I6,14 Tan,very stiff, moist,silty CLAY, very intense HC odor
<br /> CL
<br /> 20— SB5-20 2383 9,17,23 Brown, stiff,moist,silty CLAY,very intense HC odor
<br /> CL
<br /> ' – SB5-25 4650 9,18,22 Brown,stiff, moist,silty CLAY,very intense HC odor
<br /> ' CL
<br /> 30— SB5-30 375 6,15,12 Gray, firm to stiff,moist, silty CLAY, intense HC odor
<br /> 1
<br /> CL
<br />' – SB5-35 180 4,18,26 Gray blue, firm to stiff, moist, silty CLAY, intense HC odor
<br />'
<br /> 40— SB5-40 68 9,16,23 SM Tan,medium dense,moist, silty SAND, slight HC odor
<br /> Advanced
<br />'
<br /> GeoEnviron mental, Inc.
<br /> L 1AMIPROkBDRiNG-15MBP L DIlSB5 SAM 07125199 @ 10 13 AM
<br />
|