My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKE
>
12686
>
2900 - Site Mitigation Program
>
PR0516329
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 12:00:52 PM
Creation date
3/4/2020 11:19:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0516329
PE
2965
FACILITY_ID
FA0012560
FACILITY_NAME
KELLOGG GARDEN PRODUCTS
STREET_NUMBER
12686
STREET_NAME
LOCKE
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237
APN
05132011
CURRENT_STATUS
01
SITE_LOCATION
12686 LOCKE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board - <br /> Central Valley Region <br /> I Robert Schneider,Chair ' <br /> Terry Tamminenor Arnold Schwaaenegger <br /> Fmironmenta(P <br /> SecretalP oohGion Sacramento Main office Go,e o, <br /> rInteract Address: http://www.swrcb.c&gov/—mgcb5 <br /> 11020 Sun Center Drive,#200,Rancho Cordova,CA 956706114 <br /> Phone(916)4643291•FAX(916)4644790 <br /> 19 November 2004 <br /> Mr. Chris Littlefield <br /> Kellogg Garden Products <br /> 12686 Locke Road <br /> Lockeford, CA 95237 <br /> CONDITIONAL APPROVAL, GROUNDWATER MONITORING WELL INSTALLATION <br /> WORKPLAN, KELLOGG GARDENPRODUCTS,LOCKEFORD,SANJOAQUINCOUNTY <br /> Regional Board staff has reviewed the 10 November 2004 Groundwater Monitoring Well Installation <br /> Workplan prepared by ECO:LOGIC Engineering. The workplan was required by the 9 September <br /> 2004 Regional Board correspondence. <br /> I have the following comments on the workplan: <br /> • Proposed Well MW-3R is identified as the background groundwater quality well. However the <br /> well might be located downgradient of the storm water pond if the gradient is more to the south <br /> than anticipated. Therefore, please consider moving the well to an area near the Administration <br /> Building,which is likely to be upgradient of all potential site source areas. <br /> • The workplan states the wells will be drilled using a sonic drill rig. If a sonic rig is used,well <br /> centralizers will be needed to maintain a minimum two-inch seal thickness as required by <br /> California Well Standards Section 9.C. Please submit a revised Typical Monitoring Well <br /> Construction detail for well installation using a sonic drilling rig. In a telephone conversation <br /> on 18 November 2004,Thomas Butler informed me that the wells might be installed using a <br /> hollow stem auger drilling rig. Use of a hollow stem auger drilling rig is acceptable to staff and <br /> eliminates the need to use centralizers or to submit a revised well construction detail <br /> • The workplan includes plans to disinfect the wells immediately after development. You may <br /> want to collect data prior to performing the disinfection to determine if it is necessary. <br /> • The well sampling does not include all the analytes listed in the Revised Monitoring and <br /> Reporting Program No. 5-00-227. Please add boron and iron to the list of analytes in the group <br /> of standard minerals and collect the samples in the first quarter of the year rather than the fourth <br /> quarter. <br /> California Environmental Protection Agency <br /> 0 Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.