Laserfiche WebLink
'CVvATC <br /> placed directly from the mixing truck into the boreholes. The drill cuttings will be spread out on <br /> site in the pond area. <br /> Report Preparation <br /> Upon completion of the drywell destruction activities, a summary report will be prepared for <br /> submittal to PHS/EHD. The report will include a description of all field activities. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. All work will be performed in accordance with ATC's Site <br /> Safety Plan contained in Attachment 1 and Quality Control/Quality Assurance Plan contained in <br /> Attachment 2. <br /> Proiected Schedule <br /> ATC has scheduled drywell abandonment activities for July 17 and 18, 2000. After analytical <br /> results have been received and PHS/EHD has granted verbal permission, the drywell boreholes <br /> will be backfilled on July 20, 2000. Sanwa Bank California would like a written or verbal <br /> notification on July 21, 2000 indicating the site has been granted closure and the occupancy <br /> permit will be issued. <br /> If you have any questions or require additional information regarding this workplan, please <br /> contact us at(209) 579-2221. <br /> Respectfully submitted, <br /> ATC Associates Inc. <br /> D 'I/ <br /> Drew Van Allen JEANNE <br /> Project Manager HOMSEY �"T <br /> LO <br /> Pio. u07410 v1. <br /> ESP - 7a . <br /> Jeanne Homsey, P.E. <br /> Registered Engineer No. C47410 <br /> Attachments <br /> cc: Mr. Stan Olson, Sanwa Bank California <br /> Mr. Louis Perez, AMES <br />