My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1210
>
2200 - Hazardous Waste Program
>
PR0505935
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 12:04:33 PM
Creation date
3/4/2020 11:25:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505935
PE
2229
FACILITY_ID
FA0005626
FACILITY_NAME
SANBORN CHEVROLET INC
STREET_NUMBER
1210
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95241
APN
04728013
CURRENT_STATUS
01
SITE_LOCATION
1210 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Renee s id they would cleanup the spill and will advise the client to evaluate the <br /> building. Nitrile gloves and Polycoated tyveks (yellow) should provide adequate <br /> contact rotection. She said saw dust will cause the material to volatilize and that <br /> diatomatious earth or clay should be used to absorb the spill. After washing the <br /> spill area with detergent protective clothing can be downgraded to a level "C". <br /> The odc r threshold is the same as the 8 hour TLV. If there is any residual odor <br /> in the niorning call an industrial hygienist. The strategy is to decontaminate the <br /> area and ventilate for 24 hours. I told her I would be out here until it is clean. <br /> I allowed people to enter the sales office as long as the back door remains shut. <br /> The sales office is a separate building from the repair building. There is no odor <br /> in the sales office. <br /> 3:00 I called PHS/EHD office and informed Kasey and Doug that cleanup is in <br /> progress. Kasey discussed the need for an Industrial Hygienist to open the <br /> buiildin with Mr. Calton. <br /> I called Norm Davely of the Agricultural Commissioners office. He stated that <br /> the spill should be barricaded from any storm drains. Kitty litter should be placed <br /> on the spill. Malathion is non-restricted. Malathion is not used much in <br /> Agricultare and is more of a home use now. <br /> 3:30 Roger said he has one 55 gallon drum containing rags and protective clothing. <br /> The ragq were used to soak up the simple green and Malathion rinsate. There are <br /> 2 16 gallon poly containers containing decontamination water. Laidlaw will <br /> manifest the Decontamination water off site. <br /> Cross street for the site is Kettleman. <br /> 3:45 Left Site. <br /> 10/10/94 Prop 65 Filed <br /> I calledDennis Calton regarding the conducting exposure record interviews. He <br /> wants me to do them at 3:00 (the employees break time). He said Roger <br /> Chesshire of Laidlaw (916) 631-8015 has the Industrial Hygienist report and the <br /> removal manifests. Conducted interviews. 4.2 hours <br /> 10/11/94 Continued interviews. 1.5 hours <br /> 10/12/94 Intervie ied the last person. .3 hours <br /> 10/20/94 Called Roger Chesshire (916) 631-8015 regarding the industrial hygienist report <br /> and removal manifests. I received a fax of the unsigned letter from Roger to <br /> Dennis s ying there is no need for an Industrial Hygienist to open the building. <br /> PHS/EH had discussed the need for an Industrial Hygienist report with Mr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.