My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1210
>
2200 - Hazardous Waste Program
>
PR0505935
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 12:04:33 PM
Creation date
3/4/2020 11:25:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505935
PE
2229
FACILITY_ID
FA0005626
FACILITY_NAME
SANBORN CHEVROLET INC
STREET_NUMBER
1210
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95241
APN
04728013
CURRENT_STATUS
01
SITE_LOCATION
1210 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment �j <br /> Secondary Containment Assessment Page B <br /> (San Born Chevrolet)Design of Tank <br /> The Tank is a Containment Solutions:65D Galion double wall 10 gauge steel tank. The tank is <br /> rectangular in construction(see manufactures drawings). The Containment Solutions design provides <br /> that the inner tank is completely enveloped by the outer tank. The exterior/secondary tank has an <br /> epoxy coated finish. The inner/primary tank does not require corrosion protection. The tank is located <br /> indoors down stairs in the basement at the San Born Chevrolet Quick Lube Facility and is secured under <br /> lock and key within the building that has full security alarm systems. The tank uses a Scully level gauge <br /> to visually monitor the primary tank levels and provide visual and audible positive shut off over fill <br /> controls. The same BJ Enterprises Monitoring System is used to monitor the secondary/interstitial <br /> space for primary tank failure. The tank is in such a position that it provides acceptable clearance for_. <br /> _ �. <br /> visual inspections. <br /> RECEIVEL, <br /> MAR 2 7 2015 <br /> ENVIRONMENTAL <br /> NFGITu ncoeoT4AcK,T <br />
The URL can be used to link to this page
Your browser does not support the video tag.