Laserfiche WebLink
10) Results of Tightness Test: <br /> An inspection has been performed to verify the integrity of the waste oil system. The <br /> pressurized s ystem and vented tank have no leaks. <br /> 11) Estimated Remaining Service Life: <br /> This waste o 1 system,if maintained properly and visually inspected for leaks, <br /> corrosion,or structural damage, should be a safe and reliable system, conforming to <br /> Title 22 requ rements regarding hazardous waste storage systems for at least 20 years. <br /> Certification of Compliance: <br /> I certify under penalty of law that this document and all attachments were prepared under <br /> my direct supervision in accordance with a system designed to assure that qualified <br /> personnel properly gather and evaluate the information submitted. Based on my inquiry of <br /> the person or persons who manage the system,or those persons directly responsible for <br /> gathering the information,the information submitted is, to be to the best of my knowledge <br /> and belief,true, accurate, and complete. I am aware that there are significant penalties for <br /> submitting false information,including the possibility of fine and imprisonment for <br /> knowing violations. <br /> Sincerely, q,0FESslon <br /> W ski F2i2 <br /> �Acc <br /> 2 <br /> s <br /> No. C344590 <br /> * EXP. 3-31-10 <br /> OF C Ali <br /> Michael W. Smi h,P.E. <br /> R.C.E. 44590 <br /> Mike Smith Engineering, Inc. <br />