My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1210
>
2200 - Hazardous Waste Program
>
PR0505935
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 12:04:33 PM
Creation date
3/4/2020 11:25:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505935
PE
2229
FACILITY_ID
FA0005626
FACILITY_NAME
SANBORN CHEVROLET INC
STREET_NUMBER
1210
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95241
APN
04728013
CURRENT_STATUS
01
SITE_LOCATION
1210 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seismic/Ancho ng: <br /> Seismic/dy amic/hydrostatic load calculations provided with "Hydrostatic <br /> and Seismi Analysis" page or as Attachment(s) <br /> Seismic/Ancho ing findings: The tank as designed and operated, and the <br /> containment are in which it is located are adequately anchored and are <br /> seismical) soun Initials: <br /> Leak Test: 191(6)(9)/192(k)(10) <br /> Brief description of leak test, including type of test used, and results of <br /> test: <br /> Integrity testing findings: Based on the above noted integrity test and the <br /> results obtainedrom that test, the tank has sufficient integrity for its intended <br /> use. Initial : <br /> Tank Drawing: 1 1(g)(2)(E)/192(k)(2)(E)) <br /> Facing <br /> N E S W <br /> Provide a drawing of the tank, indicating the dimensions of the tank, locations of <br /> seismic devices, piping, pumps and other ancillary equipment. Circle the <br /> direction facing as seen in the lower left corner of the map. <br /> Tank Diameter: <br /> Tank Height: <br /> Tank Gross Capacity (Volume): <br /> Company Name Tank/Tank System identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.