L & M OPERABLE UNIT-THIRD QUARTER 2013 SITE STATUS, REMEDIAL SUMMARY, <br /> AND GROUNDWATER MONITORING REPORT <br /> Groundwater Monitoring and Sampling <br /> November 1, 2013 <br /> Historical thickness of SPH in wells DPE-1 through DPE-13 and MW-40 has from 0.01 ft <br /> (DPE-12, February 2005) to a shallow zone maximum thickness of 11.72 ft (DPE-1, November <br /> 2003). Well MW-40 was abandoned in November 2008 due to the City of Stockton's excavation <br /> activities. DPE wells were not monitored in accordance with MRP R-5-2012-0805. <br /> A summary of 3Q13 SPH sheen in comparison to the 2Q13 is provided in the following table. <br /> SPH SPH <br /> Well Thickness Thickness Difference <br /> Identification 2Q13 (Feet) 3Q13 (Feet) (Feet) <br /> 2AMW-13 Sheen Sheen NA <br /> 2AMW-14 Sheen** Sheen** NA <br /> MW-19 Sheen Sheen NA <br /> Definitions: <br /> NA = Not applicable <br /> SPH = Separate phase hydrocarbon <br /> ** = Connected to free product removal system <br /> SPH removal activities are conducted quarterly (at a minimum) for on and off Site wells which <br /> repeatedly contain measurable thickness of SPH and are not connected to the offsite <br /> remediation system. It should be noted that these SPH removal activities are typically <br /> performed between quarterly monitoring events, and are likely to influence reported SPH <br /> thickness. Due to the installation of the new free product removal system (April through May <br /> 2013) on the Waterfront Towers Parking lot facility, quarterly SPH removal in the wells located <br /> offsite to the north has ceased, effective 1Q13. This free product removal system was <br /> anticipated to be in place and operational by the end of 2Q13 or beginning of 3Q13; thus a <br /> quarterly free product removal event was not scheduled for the reporting quarter. Due to delays <br /> outside of Stantec's control, the system was not able to be started until 9/10/13. <br /> 5tantec 2.12 <br />