My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_3Q13 QSSR QRSR QMR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1444
>
2900 - Site Mitigation Program
>
PR0527031
>
ARCHIVED REPORTS_3Q13 QSSR QRSR QMR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 1:52:18 PM
Creation date
3/4/2020 11:55:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
3Q13 QSSR QRSR QMR
RECORD_ID
PR0527031
PE
2957
FACILITY_ID
FA0018318
FACILITY_NAME
FORMER COLUMBO / TOSCANA BAKERY
STREET_NUMBER
1444
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503005
CURRENT_STATUS
01
SITE_LOCATION
1444 S LINCOLN ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
946
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L & M OPERABLE UNIT-THIRD QUARTER 2013 SITE STATUS, REMEDIAL SUMMARY, <br /> AND GROUNDWATER MONITORING REPORT <br /> Planned Activities for Next Reporting Period <br /> November 1, 2013 <br /> 7.0 Planned Activities for Next Reporting Period <br /> The following is a list of planned activities for the fourth quarter 2013: <br /> • Continue groundwater monitoring and sampling in accordance with MRP <br /> (No. R5-2012-0805). <br /> • Continue with quarterly soil vapor point sampling. <br /> • Continue with routine O&M of existing remediation systems. <br /> • Stantec has submitted a formal letter recommending shutdown of the onsite remediation <br /> systems. Pending further discussion and approval from the RWQCB-CVR, Stantec will <br /> continue operation of the ASVE and SVE systems, and operation of the DPE system as <br /> field conditions warrant or until further notice from RWQCB-CVR. <br /> • Submit a remedial system start-up report for the new product recovery system installed <br /> offsite at the Waterfront Towers parking area. <br /> • Continue with operation and maintenance of SPH recovery system off site at the <br /> Waterfront Towers parking area. <br /> 5ta ntec 7.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.