Laserfiche WebLink
L & M OPERABLE UNIT-THIRD QUARTER 2013 SITE STATUS, REMEDIAL SUMMARY, <br /> AND GROUNDWATER MONITORING REPORT <br /> Planned Activities for Next Reporting Period <br /> November 1, 2013 <br /> 7.0 Planned Activities for Next Reporting Period <br /> The following is a list of planned activities for the fourth quarter 2013: <br /> • Continue groundwater monitoring and sampling in accordance with MRP <br /> (No. R5-2012-0805). <br /> • Continue with quarterly soil vapor point sampling. <br /> • Continue with routine O&M of existing remediation systems. <br /> • Stantec has submitted a formal letter recommending shutdown of the onsite remediation <br /> systems. Pending further discussion and approval from the RWQCB-CVR, Stantec will <br /> continue operation of the ASVE and SVE systems, and operation of the DPE system as <br /> field conditions warrant or until further notice from RWQCB-CVR. <br /> • Submit a remedial system start-up report for the new product recovery system installed <br /> offsite at the Waterfront Towers parking area. <br /> • Continue with operation and maintenance of SPH recovery system off site at the <br /> Waterfront Towers parking area. <br /> 5ta ntec 7.1 <br />