My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_MONITORING WELL INSTALLATION AND BIOSPARGE EVALUATION REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1444
>
2900 - Site Mitigation Program
>
PR0527031
>
ARCHIVED REPORTS_MONITORING WELL INSTALLATION AND BIOSPARGE EVALUATION REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 1:37:52 PM
Creation date
3/4/2020 12:03:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
MONITORING WELL INSTALLATION AND BIOSPARGE EVALUATION REPORT
RECORD_ID
PR0527031
PE
2957
FACILITY_ID
FA0018318
FACILITY_NAME
FORMER COLUMBO / TOSCANA BAKERY
STREET_NUMBER
1444
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503005
CURRENT_STATUS
01
SITE_LOCATION
1444 S LINCOLN ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The last monthly remediation status report available on GeoTracker was from August 2009. <br /> ' The cumulative amount of gasoline range organics (GRO) removed from the subsurface at <br /> that date was estimated to be 463 pounds. The sparging system was tested in August with 4.5 <br /> cubic feet per minute of air sparged into each well at 8 to 10 psig. The influent VOC <br /> ' concentrations to the SVE wells increased during this test by over 20%. The air sparge <br /> system was scheduled for continuous start up in September 2009. <br /> The air sparging performed for the test at Dolly Madison was more in line with biosparge <br /> injection pressures and flow rates than air sparging. It is PSC's opinion that sparging at this <br /> pressure and flow rate will be more beneficial for removal of contaminants than the system <br /> ' proposed for the Transmission store. The system will have to be expanded to remove <br /> contamination from lower permeable zones. <br /> 3.3 Sampling for Biosparge Evaluation <br /> PSC collected soil samples on approximate five-foot intervals during drilling of the June 2009 <br /> ' monitoring well installations. Soil samples collected from the permeable zones where the <br /> well was to be screened were submitted to a biotechnology laboratory for bacterial and <br /> nutrient analyses. Samples selected from the saturated silty sand and sandy intervals were <br /> submitted to Cyto-Culture Environmental Biotechnology and McCampbell Analytical, Inc. <br /> for analysis of the following parameters: <br /> • Total Aerobic Heterotrophs and Total Aerobic Hydrocarbon Degraders by Standard <br /> ' Method(SM) 9215A (HPC)/9215B modified; <br /> • Total Ammonia as Nitrogen by SM 4500-NH3C or EPA 350.1; <br /> ' • Nitrate as Nitrogen by CA Title 22 Modified (DISTLC)/EPA 300.0; <br /> ' • Sulfate by CA Title 22 Modified (DISTLC)/EPA 300.0; <br /> • Fractional Organic Content by ASTM D2974-87; and <br /> • Ortho-Phosphate by SM 4500-PE or CA Test 417/422. <br /> Once the new groundwater monitoring wells were installed, samples collected from the new <br /> wells, as well as samples collected from VE-1 (shallowest well on site), MW 7S, and MW7D, <br /> were also submitted to McCampbell Analytical for analysis of: <br /> ' • Alkalinity(as CaCO3 for total and speciated) by SM2320B; <br /> • Total Aerobic Heterotrophs by Standard Method (SM) 9215A (HPC) / 9215B <br /> ' modified; <br /> • Total Ammonia as Nitrogen by SM 4500-NH3C or EPA 350.1; <br /> ' • Nitrate as Nitrogen by CA Title 22 Modified (DISTLC)/EPA 300.1; <br /> Monitoring Well Installation <br /> and <br /> BioSparge Evaluation Report <br /> ' Prepared For:Sate Lee Bakery Group,Inc. 15 Prepared By:PSC Industrial Outsourcing,LP <br /> Sara Lee—Lincoln Street 2009_12_03-MW Installation&BioSparge Evaluation Report(Final).doc Report Date:December 3,2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.