My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_VAPOR INTRUSION SURVEY - SOIL GAS SAMPLING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1444
>
2900 - Site Mitigation Program
>
PR0527031
>
ARCHIVED REPORTS_VAPOR INTRUSION SURVEY - SOIL GAS SAMPLING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 1:29:37 PM
Creation date
3/4/2020 1:12:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
VAPOR INTRUSION SURVEY - SOIL GAS SAMPLING REPORT
RECORD_ID
PR0527031
PE
2957
FACILITY_ID
FA0018318
FACILITY_NAME
FORMER COLUMBO / TOSCANA BAKERY
STREET_NUMBER
1444
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503005
CURRENT_STATUS
01
SITE_LOCATION
1444 S LINCOLN ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 In accordance with the August 15, 2008 CVRWQCB response letter request, PSC prepared <br /> and submitted the Vapor Intrusion Survey — Soil Gas Sampling Work Plan on September 30, <br /> 2008. The field activities were performed in January 2009. This report describes the findings <br /> 1 of the investigation. <br /> In accordance with the August 15, 2008 CVRWQCB request, PSC submitted the Feasibility <br /> 1 Study/Remedial Evaluation Report to CVRWQCB on November 30, 2008. The CVRWQCB <br /> reviewed the report and submitted a request to submit a remediation pilot study work plan in a <br /> letter dated December 23, 2008. The pilot study work plan is due on April 1, 2009. In <br /> 1 accordance with subsequent correspondence with CVRWQCB, the additional monitoring well <br /> installation work plan will be submitted in a separate document due March 30, 2009. <br /> On behalf of Sara Lee, PSC has begun discussions with the responsible parties of the <br /> 1 neighboring sites to collaborate efforts in investigation and corrective action for the numerous <br /> releases in the approximate 4-acre area around Charter Way and Lincoln Street. These <br /> discussions are focused on entering the various open UST sites into the California UST Fund <br /> 1 Commingled Plume Account (CPA). In addition, as part of the coordinating efforts to obtain <br /> correlating data among the adjacent properties, the quarterly groundwater monitoring efforts <br /> have been scheduled to coincide with the adjacent properties. PSC is providing CVRWQCB <br /> 1 with monthly status reports on the progress of moving forward with the CPA. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> i <br /> 1 <br /> 1 <br /> Vapor Intrusion Survey <br /> Soil Gas Sampling Report <br /> 1 Prepared For:Sam Lee Bakery Group,Inc. Prepared By:PSC Industrial Outsourcing,LP <br /> Sara Lee—Lincoln Street\2009_03_31-Soil G.Sampling Reportdoc March 31,2009 <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.