Laserfiche WebLink
Mr. Ron Rowe <br /> November 24, 1997 <br /> Page 6 <br /> t <br /> REPORTING <br /> SECOR will prepare and submit a letter report summarizing the CPT findings to the SJCEHD. If necessary, <br /> recommendations for future monitoring well installations will also be included in the letter report. <br /> 5.0 SCHEDULE <br /> SECOR is prepared to begin work immediately upon approval of this Work Plan from the SJCEHD. The <br /> preliminary field activities will require approximately two weeks to complete. We anticipate that the CPT survey <br /> will require one week to complete. Laboratory analyses will require one week from the sample submittal time. <br /> A letter report will be submitted to the SJCEHD within two weeks of receipt of all analytical data from the <br /> laboratory. <br /> If you have any questions or comments regarding the Work Plan,please do not hesitate to contact us at(415) <br /> 882-1548, <br /> Sincerely, <br /> SECOR International Incorporated <br /> lea k-5k .�� . <br /> Nancy A.Bond Brace E. Scarbrough " 0 <br /> Project Manager Principal Geologist + � <br /> cc: Mr. Christopher Rants,Metz Baking Company BW ROUGH <br /> k 4931 <br /> Tables: Table 1 -Soil and Groundwater Laboratory Analytical Results <br /> Table 2-Soil Sample Results of Physical Analyses <br /> 0 <br /> Figures: Figure 1 -Site Location Map W <br /> Figure 2-Site Plan with Proposed CPT Locations <br /> Attachments: Attachment A- Soil and Groundwater Sample Laboratory Analytical Reports and Chain-of- <br /> Custody Records <br /> Attachment B -Boring Log for Monitoring Well MW-7 <br /> Attachment C-Groundwater Sample Field Data Sheets <br /> Attachment D-San Joaquin County Environmental Health Division Well Construction Permit <br /> Application <br /> H AS FFBM'0CKTON4W KP2.RPT <br /> . J <br />