Laserfiche WebLink
CLEANUP AND ABATEMENT ORDER NO. R5-200770725 <br /> DOLLY MADISON/LANGENDORF BAKERY <br /> 1426 S. LINCOLN ST.; STOCKTON <br /> SAN JOAQUIN COUNTY <br /> -9- <br /> REQUIRED ACTIONS <br /> IT IS HEREBY ORDERED that, pursuant to California Water Code Section 13000, Section <br /> 13304 and Section 13267, Interstate Brands Corporation; Timothy Kong, Lorrie Greene, <br /> Temple of Deliverance Church of God in Christ, and Jason Hunt, shall- <br /> 1. <br /> hall:1. Investigate the discharges of waste, clean up the waste, and abate the effects of the <br /> waste, forthwith, resulting from activities frorri'the former UST system at 1426 S. Lincoln <br /> St., in Stockton, in conformance with State Board Resolution No. 92-49 Policies and <br /> Procedures for Investigation and Cleanup and Abatement of Discharges Under Water <br /> Code Section 13304 and with the Regional Board's Water Quality Control Plan for the <br /> Sacramento River and San Joaquin River Basins (in particular the Policies and Plans <br /> listed within the Control Action Considerations portion of.Chapter IV). "Forthwith" means <br /> as soon as is reasonably possible. Compliance with this requirement shall include, but <br /> not be limited to, completing the tasks listed below. <br /> 2. All work and,reports shall follow the Appendix A - Reports, Tri-Regional <br /> Recommendations for Preliminary Investigation and Evaluation of Underground Storage <br /> Tank Sites (Appendix A - Reports) which is attached and made a part of this Order, and <br /> under permits required by State, County, and/or Local agencies. <br /> PUBLIC PARTICIPATION <br /> 3. By 16 November-2007, submit a Public Participation Plan. The Public Participation Plan <br /> shall solicit the public's concerns and disseminate information to the public regarding the <br /> investigation and proposed cleanup activities at the sites. The Public Participation.Plan <br /> shall be updated as;necessary to reflect any significant changes in the degree of public <br /> interest as the site investigation and cleanup process moves toward completion. <br /> SITE HISTORY <br /> 4. By 16 November 2007, submit a report to the best of the Discharger's abilities <br /> documenting the site's history since the tanks were installed including a chronology of the <br /> site's ownership and operator history.,. any evidence detailing the time andr origin of the <br /> discharges of waste, and the fee title owner. Information in this report may be used to <br /> identify additional responsible parties who may be added to this or future orders, or revise <br /> this Order. <br />