Laserfiche WebLink
fri Ite2ional Recommendmion- Pa,,e-a of 2a <br /> Appendix A <br /> implement the approved Site Investigation Work <br /> plain. If workplan revisions are necessary. the dis- - - Date of tank(s) removal and condition of <br /> charger ntay submit a letter addendum briefiv the tank system: <br /> detailing any proposed cliaitLes to the workplan or - Table of soils and or water analyses: <br /> additional work. - Soil Santpli112 and analvtical•procedures <br /> used: <br /> The following background infotmaiion is to be - Stratigraphy identified front excavations <br /> included in the initial Site Investigation Workplan: or borings: <br /> Depth to groundwater. if encountered: <br /> I <br /> Name and address of the site; the discharger and <br /> and contact person. if different. - . Description of ani unusual site condi- <br /> lions encountered. <br /> • An appropriately scaled•area map showing <br /> the site location-relative to nearby landmarks Estimate ofthe.quan(ity.and cotrrposition of <br /> such as rivers and other surface water tea- contaminant released into the environment ! <br /> tures. highwa\!s. urban of industrial areas. and how the estimate was derived. <br /> •etc. I <br /> • Include initial abatement actions including a <br /> • A scaled drawing of the site sliowine•adja- description of liquid or solid wastes re- <br /> cent streets and buildings, all above ground moved and where they,were disposed with <br /> structures including canopies and po�yer copies of all manifests. <br /> .lines, underground structures including fuel <br /> US•rs: utility lines.-(\vater;se�vet-,electrical. In addition to the background information re- <br /> natural gas, and communication lines), bur- quested for the Site Investigation Workplan listed <br /> ied.pipes, septic tanks. and leachftelds. The above. the ntet:hods and procedures that will be <br /> ntap scale should be appropriate to show site used to im-estigate both impacted soil and ground- <br /> 1eatures. water should be included, and an estimated time ! <br /> schedule for completion of proposed work nttrst <br /> • Pertinent information Iliat could inllLie ncce also be included.with.the workplan. <br /> the migration of contaminants from the site Specific to the soil contamination, describe or iden- <br /> is to be included in the �;,ork.pla.n including: tify the method:. technique. and/or rationale for: i <br /> topography. climate, local geology and sub- <br /> surface soil'conditions. local and regional Collecting soil, soil gas. and sediment sant- <br /> hvdrot��eology. nearby surface waters. pies, as appropriate. <br /> _. <br /> • Flistory of tank installation, type of products Determining t:lae number of proposed bore- � <br /> stored. operation.and repair. holes. sampling locations. and sampling <br /> depths. <br /> • <br /> -avow of all former and existing US'rs and : <br /> piping systems on the,proI erly..\vith-each. 'Determining t•Ite e:`tent of soil conlaminarion ' <br /> tank labeled for content, front samples collected. <br /> • History of leaks, spills and accidents at the -Analyzing soil, soil gas. and sediment sam- <br /> site involving the tank systent and dispens- pies by appropriate federal EPA Methods or <br /> ers. other tion-proprietary:performance-based <br /> analytical procedures. <br /> • tank testing results. dates. and inventory <br /> reconciliation methods. Containing and disposin'. of inyestic�allgn- <br /> derived \yaste. <br /> • <br /> Summary of initial site information collected <br /> during UST removal including: <br />