Laserfiche WebLink
- t <br /> Tri Re,iunal P i,.2e 6 of 74 <br /> Appendix A <br /> Note: To satisfy Basin flan requirements and <br /> Resolution No. 88-63. which states ill part'. Copies of drillers and/or geologist logs for <br /> all surface and ground waters of the State are drilling and.consiruction. <br /> considered to be suitable; or potentially suit- <br /> able. for municipal or domestic water sup .Appropriate field notes from well develop-_ <br /> plv..."see `fable i. for a list of Numerical merit \\illi descriptions of parameter stabili- <br /> Watei Quality Limits for Petroleum Based zation (e. . tables showingpl1. electrical <br /> Fuel components for protection of existing conductivity, temperature. turbidity. devel- <br /> or.poiential sources of drinking water. opment method. and volume of groundwater <br /> purged from tile•well). <br /> These Limits change from time-to-time. The <br /> current list of numerical limits may be found "Type ofdrilling rig equipment used fnr Well <br /> on the internes at construction, names of the driller and super- . <br /> I:th: r h:ca. oy .n+gcbs.<t ,ilal lc vising•field geologist, plus any difficulties <br /> encountered durin�� drilling Ilial COuld affeC'1 <br /> the'lUtm-e quality of data from the well. <br /> • Appropriate conclusions, and recomimenda- <br /> tions for additional work. as necessary: Workplans.aiid summary reports are to be prepared <br /> and submitted to the LIA and Regional Board until <br /> M0111101-in2 \�ell diaLrams are to represent the the lateral and vertical extent of contamination is <br /> completed well and shoe- cif-describe the,fol defined. The proposed additional vvork may be <br /> lowing:. submitted separately. or with the quarterly status <br /> reports <br /> • ; r,ae(ur;lte depiction of monitoiin`I well <br /> Consuuciion. please note that site conditions may warrant in- <br /> terim cleanup and removal actions before the lat- <br /> • I-ypes and quantities of materials placed in' era.l and vertical extent of contamination is <br /> the borehole. completeiy def-fined. For interim remedial <br /> actions. the discharger shall follow the <br /> • Placement method of the annular"seal mate- requirements outlined in the UST Regulations. <br /> rials. (e.`a. pumped through a tremie pipe. of §2722(b). <br /> poured from the surface). <br /> • Location of screen Interval, translttnn seal. <br /> and sanitan seal details. <br /> • Nominal.inner diameter(ID) and outer d - <br /> an?eter(OD) of-the auger and casing. <br />