Laserfiche WebLink
Page 2 of 2 <br /> well as the two page Well Permit Application Form. If you sign the application, have the <br /> driller sign the authorization at the bottom of page two. NO need for the driller to <br /> complete more on the second page. I get that info on the State contractors page. <br /> From: Richard Gandolfo [mailto:rgandolfo@engeo.com] <br /> Sent: Wednesday, June 17, 2009 11:24 AM <br /> To: Mike Infurna [EH] <br /> Subject: Lathrop Piezometer <br /> Hi Mike, <br /> I'm putting together a work plan to abandon a '/3 inch diameter piezometer on Louise Avenue (apprx <br /> 850 feet west of McKinely Avenue-on south side). <br /> It's my understanding that I will need to do the following; <br /> • Work Plan ($60) <br /> • Unit IV Well Application ($315) <br /> • Over-bore with 12" hollow-stem auger. <br /> • Tremie grout with neat cement. <br /> • 2-3 lead time after application submittal/payment confirmation prior to drilling. <br /> Let me know your thoughts. <br /> Thank You <br /> Richard Gandolfo <br /> Project Manager <br /> Et' GLU <br /> t N C O R P O R A T f D <br /> ENGEO Incorporated- Expect Excellence <br /> 580 N. Wilma, Suite A <br /> Ripon, CA 95366 <br /> 209-835-0610 <br /> Fax: (888)279-2698 <br /> Cell: (209) 321-2665 <br /> +s++++++++rr++«+++«++«+++++r++«++++++++«+sss+«++r+++rsass++ssssrassssrr+s«rsss+waw+++++++++++«+++++«+++++++++++ <br /> Due to the potential that information exchanged by electronic media can deteriorate,be damaged,lost or modified unintentionally or <br /> otherwise,use of this electronic data by anyone other than ENGEO Incorporated shall be at the sole risk of such user and without liability <br /> or legal exposure to ENGEO Incorporated. The recipient is responsible for verifying the accuracy ordain against governing hard copy <br /> documentation. Recipient assumes all risks in the changing or modification of data acid revisions or updating of hard copy documents. <br /> 6/18/2009 <br />