Statttec v <br /> February 18, 2011 <br /> Mr. Ken Sommers <br /> Page 6 of 6 <br /> Reference: Phase II Environmental Site Assessment <br /> PROJECT SCHEDULE <br /> Stantec has submitted this work plan for approval by the San Joaquin County EHD. Upon approval <br /> it is estimated that the field activities described above will begin with 10-days and will require <br /> approximately 4-5 weeks to complete. This anticipated schedule is dependent on notice to <br /> proceed, the approval from San Joaquin County EHD, the availability of skilled of the EHD <br /> inspectors, and Site access. <br /> If you have any questions or require additional information, please call (559) 271-2650. <br /> Sincerely, <br /> STANTEC CONSULTING CORPORATION <br /> S\ANAL SFO <br /> QA{ CAgS �O� <br /> Ralph Carson, P.G. No.7454 Steven C. Brady, C.E.G., C.HG., R.E.A. <br /> Senior Geologist EXP Managing Principal Hydrogeologist <br /> Tel: (559) 271-2650 s \P Tel: (805) 230-1266 <br /> Fax: (559) 271-5108rgrFCF cA�\FOPS Fax: (805) 230-1277 <br /> Ralph.Carson(a)stantec.com Steven.Bradv a stantec.com <br /> Attachment: Figure 1 — Proposed Soil Vapor Boring Location Map <br /> (:\Projects\Calpine\Lodi\Work Plan\CalpineLodi.Work Plan.docx <br />