1 , <br /> rootogicat reckaka 14c. Page 7 <br /> Sinclair Trucking <br /> Project No.: 1030.2 <br /> November 1,2005 <br /> © The thickness of the deep TPH-G contamination is assumed to be 3.5-feet, primarily <br /> occupying the depths between 10.5 and 14 feet bgs. <br /> ' ® Historical depth-to-groundwater measurements average 11.25 ft bgs. <br /> ® Mass balance calculations assume the entire 3.5-foot thick units consist of uniform <br /> contaminant concentrations. <br /> ' o Contaminated soil removed during soil boring and monitoring well installation activities <br /> was not subtracted from the overall mass volume. <br /> Natural attenuation was not used in determining remaining mass. <br /> 1 <br /> 2.3 Excavation <br /> An area of approximately 1,360 square feet was opened during the soil excavation activities. <br /> Five to six feet of clean overburden was stockpiled near the southeastern portion of the <br /> ' property. The remaining contaminated soil was excavated to a depth of approximately 13.5 <br /> feet below grade. Approximately 400 cubic yards of contaminated soil was excavated and <br /> stockpiled in a staging area in the northeastern portion of the property. <br /> ' Figure 2 shows the extent of the excavation in plan view. <br /> 2.4 Past-Excavation Mass Estimate Calculations <br /> This section discusses the mass estimate calculations generated after the advancement of ten <br /> ' (10) GeoProbe borings and two (2) soil borings as well as samples collected during the soil <br /> excavation activities and the installation of MW-1 R. A non-detect control point was <br /> interpolated between MW-4 and MW-5. The additional sampling points plotted into the <br /> ' Surfer 7.00 contour generating software suggested the plume was slightly smaller than the <br /> pre-excavation results. <br /> The calculations suggest that there were 4,506 pounds of TPH-G in soil before the excavation <br /> ' began. Since the highest number of sample points determined the estimate of 4,506 pounds <br /> of TPH-G in soil, 4,506 pounds will be considered the mass in soil prior to the excavation <br /> activities. The mass balance calculations are summarized in Table 5 of Appendix A. <br /> i <br /> The following summarizes the data and assumptions used in the post-excavation mass <br /> balance estimates: <br /> ' vat' n u <br /> Fi re 6: Post-Excavation 1 <br /> _g_. a zo Shallow <br /> • TPH-G contours were generated using soil data gathered from shallow soil samples <br /> collected prior to the soil excavation activities. The contours were generated by Surfer <br /> 7A0 contour generating software using soil samples collected between 6 and 10.5 feet <br /> bgs. <br /> • The heaviest contamination is found near the former UST encompassing an area of <br /> approximately 53.5-ftp. The area occupies the space inside and including the 6,000 <br />