Laserfiche WebLink
1 <br /> Geological Teelurics fact. Page 11 <br /> Sinclair Trucking <br /> Project No.: 1030.2 <br /> November 1,2005 <br /> 3.0 CONCLUSIONS AND RECOMMENDATIONS <br /> ' 0 The mass was larger than originally estimated in <br /> the 2003 Initial Site Conceptual Model. <br /> • Approximately 400 cubic yards of contaminated soil was removed from the site, which <br /> ' equates to approximately 1,861 pounds of soil. <br /> • Removing an additional 400 cubic yards of soil may have dramatically reduced <br /> ' contamination at the site by as much as an additional 70%. <br /> i As much as 2,645 pounds of TPH-G remains in the soil at the site, which is <br /> approximately 60% of the total mass of 4506 pounds of TPH-G estimated to be present in <br /> the soil. <br /> 0 GTI recommends continued quarterly groundwater monitoring for three more quarters. <br /> • If groundwater analyses show a decreasing or stabilized TPH-G concentrations over the <br /> ' next three quarters, GTI would recommend performing a risk analysis to evaluate the <br /> possible closure of the site. <br /> ' 4.0 LIMITATIONS <br /> This remedial action work plan was prepared in accordance with the generally accepted <br /> standard of care and practice in'effect at the time Services were rendered. It should be <br /> recognized that definition and evaluation of environmental conditions is an inexact science <br /> ' and that the state or practice of environmental geology/hydrology is changing and evolving <br /> and that standards existing at the present time may change as knowledge increases and the <br /> state of the practice continues to improve. Further, that differing subsurface soil <br /> characteristics can be experienced within a small distance and therefore cannot be known in <br /> ' an absolute sense. All conclusions and recommendations are based on the available data and <br /> information. <br /> ' The tasks proposed for this project will be reviewed and approved by the local regulatory <br /> agency for compliance with the law prior to work being performed. No warranty, expressed <br /> or implied, is made. <br />