Laserfiche WebLink
F <br /> Geological redwics Inc. Page 3 <br /> Sinclair Trucking <br /> Fi_ Project No.: 1030.2 <br /> November 1,2005 <br /> plan be prepared for the installation of a deeper monitoring well near the source to, define the <br /> vertical extent of the contamination and the installation of a sentinel well between the source <br /> and the domestic well. <br /> r <br /> GTI submitted a new work pian on June 9, 2000, proposing the installation of a single deep <br /> r monitoring well. Ms Duncan approved the work plan on June 28, 2000. A delay in the work <br /> plan implementation occurred due to a change in the Responsible Party and cost pre--approval i <br /> for the work was obtained on October 28, 2001. <br /> t In April of 2002, GTI and V&W Drilling, Inc. (V&W) installed one deep monitoring well to <br /> 35 feet below grade (MW-101). On June 18, 2002, GTI prepared and submitted the Site <br /> r Characterization, Monitoring Well Installation and Groundwater Monitoring Report <br /> documenting the work performed during April of 2002. The report recommended continued <br /> groundwater monitoring as well as testing for biodegradation indicators. In a letter dated July <br /> 22, 2002,Ms Duncan approved the recommendations. <br /> On September 30, 2002, GTI prepared and submitted the 3rd Quarter 2002 Groundwater <br /> Monitoring Report recommending the site be considered for closure. In a letter dated March <br /> 3, 2003, Ms Duncan denied the request. A meeting was scheduled between Mr. and Mrs. <br /> Sinclair, Ms Duncan and Eric Price of GTI for March 27, 2003 to discuss the direction of the <br /> project and remediation alternatives. <br /> On March 3, 2003, Lori Duncan directed ST to develop a site conceptual model. In addition <br /> to the site conceptual model, Ms Duncan requested investigation of a potential NNW/SSE <br /> ' trending sand channel. GTI prepared and submitted the Initial Site Conceptual Model on <br /> June 18, 2003. <br /> On June 24, 2003, GTI prepared and submitted the Monitoring Well Installation & GeoProbe <br /> Investigation Work Plan. Ms Duncan approved the work plan in the letter dated July 18, <br /> � t <br /> 2003, with several caveats. <br /> The following work was performed in accordance with the June 2003 Monitoring Well <br /> Installation & GeoProbe Investigation Work Plan. On November 12, 2003, GTI supervised <br /> the installation of one shallow groundwater-monitoring well (MW-5). To further investigate <br /> the lateral extent of soil impacted with petroleum hydrocarbons, GTI advanced ten (10) <br /> GeoProbe boreholes on November 10 and 12, 2003. On February 20, 2004, GTI submitted <br /> the Additional Site Characterization and 4"h Quarter Groundwater Monitoring Report <br /> discussing the work performed at the site in November 2003. <br /> On April 26, 2004, GTI prepared and submitted a Feasibility Study Addendum (Cost <br /> Comparisons). In a letter dated May 19, 2004, Ms Duncan, expressed concerns.about several , <br /> items discussed in the June 2003 Initial Site Conceptual Model and the April 2004 Feasibility <br /> Study Addendum (Cost Comparisons). <br /> f <br /> 4 <br /> 1 <br />