Laserfiche WebLink
)j_tcx`. <br /> l Mr. Franklin Cole -2- <br /> R p . The work pproducts must be acceptable to the County and the Regional Water Quality Control Board. <br /> • It is my opinion that it is junnecessary to obtain three bids for this scope of work;the Fund's three bid <br /> requirement is waived for' this scope of work. <br />;r <br /> f - • If a different scope of work becomes necessary,then you must request pre-approval of costs on the new <br /> scope of work. <br /> • Although I have referred4o the Advanced GeoEnvironmental proposal in my pre-approval above,please <br /> be aware that you will be',entering into a private contract:the State of California cannot compel you to <br /> sign any specific contract. This letter preapproves the costs as presented in the proposal dated <br /> December 9 1996 by Advanced GeoEnvironmental for conducting the work approved by the County'for <br /> implementing the March 17, 1997,Advanced GcoEnvironmental workplan. <br /> I also want to remind you thai the Fund's regulations require that you obtain at least three bids,or a bid waiver <br /> from Fund staff,'from qualified firms for all necessary corrective action work. The legislation governing the <br /> Fund requires that the Fund assist you in procuring contractor and consultant services for corrective action. If <br /> you need assistance in contracting for corrective action services,don't hesitate to call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before you <br /> will be reimbursed. To make this easier, insure that your consultant prepares his invoices to match the <br /> format of the original estimate, and provides reasonahle explanations for any changes made in the scope of <br /> work or increases in the costs. When the invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions;I can be reached at(916)227-4322. <br /> Sincerely, <br /> ED BY <br /> Ismael Jacobo,Water Resources Control Engineer r <br /> Technical Review Unit c.a <br /> Underground Storage Tank Cleanup Fund , w; a <br /> . <br /> Enclosure - r <br /> cn , <br /> cc: Ms.Margaret Lagorio <br /> San Joaquin County EHD <br /> P.O.Box 2009 <br /> Stockton, CA 95201 <br /> Our mission;is to preserve and enhance the quality of California's water resources,and <br /> 77 -• Recycled Paper ensure their proper allocation and efficient use for the benefit of present and future generations. <br />