Laserfiche WebLink
i <br /> li <br /> 11) Decontaminate sampling equipment in an alconox solution and rinse twice with water <br /> prior, to each sampling run. <br /> 12) Steam-clean auger flights after drilling. <br /> I� <br /> ! <br /> 13) Backfill each :y1boring using a concrete-bentonite slurry in the entire depth of the <br /> boring. <br /> 14) Prepare a report detailing the results of the work in an appropriate format to be <br /> submitted to the PHS/EHD. The report will be reviewed and signed by a California <br /> Registered Geologist. <br /> Theo opportunity prepare this work plan is greatly appreciated. If you have any questions <br /> PP h' to P. P <br /> or comments, pleasecontact our office. J <br /> 4 <br /> N <br /> Sincerely, ! <br /> GEOLOGICAL AUDIT SERVICES, INC. <br /> Kevin McKibben <br /> Staff Geologist <br /> ob Marty I! <br /> Project Manager I <br /> ! <br /> I� <br /> I� <br /> I <br /> I <br /> ! <br /> II <br /> Oeobpwl A.&Service.Inc. <br /> Fn comm VMM5-S/10_4/ <br /> II. <br />