My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAGNOLIA
>
510
>
2900 - Site Mitigation Program
>
PR0521824
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 11:32:15 AM
Creation date
3/5/2020 10:28:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0521824
PE
2950
FACILITY_ID
FA0014819
FACILITY_NAME
CSU STANISLAUS / STKN MULTI-CAMPUS
STREET_NUMBER
510
Direction
E
STREET_NAME
MAGNOLIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
510 E MAGNOLIA ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Cleanup Plan p MIN2 :. <br /> The primary objective of the cleanup is to prevent or a <br /> reduce potential risks to public health and the <br /> environment.The Cleanup Plan summarizes previous <br /> ui <br /> studies,outlines available cleanup activities and <br /> �..,, <br /> proposes removal options. Cleanup alternatives are <br /> screened and evaluated on the basis of their <br /> effectiveness,ability to implement and cost. <br /> DISC will review and consider comments received <br /> during the 30-day public comment period before <br /> malting final decision to approve or deny the <br /> proposed cleanup activities. <br /> Proposed cleanup method <br /> ExarEleg�aFrauE glLa le Tra ar <br /> Remove approximately 600 cubic yards(60 <br /> truckloads)of soil containing lead-based paint <br /> residue and dieldrin Fencing <br /> Transport contaminated soil,using a licensed The areas where the digging will occur will be secured <br /> hazardous waste trucking contractor,to a State- with fencing so that unauthorized personnel cannot <br /> licensed disposal facility enterthe work area. <br /> Backfill with clean imported soil,if necessary Truck route <br /> A variety of truck types will be used to remove <br /> Cleanupactivity contaminated soilfromthe site on an as needed basis. <br /> If the plan is approved,you can expect to see the Trek will travel between the hours of 7 a.m.and 6 <br /> following cleanup activities for approximatelyfour pm.Truck exiting the site will: <br /> days` • Exit on Grant Street and travel one block west to <br /> Personnel using standard Front End Loader Stanislaus Street,then proceed south onto Highway <br /> Tractor machinery and safetygear 4 <br /> • Stockpiled contaminated soil on site • Proceed westbound on I-hghway4,then merge <br /> onto Interstate 5 heading southbound to <br /> • Stockpiles covered with tarps to protect them Kettleman Cityin Kings County <br /> from wind and rain <br /> California Environmental Quality Act-Notice of <br /> • Covered truck removing soil from the site to a Exemption <br /> State-licensed landfill <br /> DTSC has prepared a Notice of Exemption(NOE) <br /> • Airborne dust monitoring for this project as required bythe California <br /> Environmental QralityAct.The Draft NOE states that <br /> Dust suppression the project will not have effects on the environment or <br /> Dust Control measures,including water spraying,will human health because of the relativelysmall volume of <br /> reduce dust during the cleanup activities.Airborne dust soil,the short duration of the cleanup,and the controls <br /> monitoring will ensure that efforts to reduce dust are in place during the excavation of soil containing lead- <br /> working.Before leaving the site,truck tires will be based paint residue and pesticides. <br /> cleaned and soil containing lead-based paint residue <br /> and pesticides will be covered with tarps so that soil <br /> will not spill out of the truck while they are on the <br /> road. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.