Laserfiche WebLink
i • <br /> Ceologccat recd/tics ltc. <br /> 1101 7"'Street <br /> Modesto,Califomia 95354 <br /> (209)5232-4119/Pax#522-4227 <br /> Work Plan Addendum #2_ <br /> Soil and Groundwater Investigation <br /> Super Stop Market <br /> Cardoza Enterprises <br /> 290 N. Main St. <br /> Manteca, CA <br /> Project No. 662.2 <br /> f July 2, 2002 <br /> Proposed Borings/Well Locations <br /> In accordance with November 31, 2001 directive from Sam Savig, a single boring (MW- <br /> 104) was advanced on May 30, 2002. A copy of the soil sample laboratory analyses and the <br /> well log for boring MW-104 are attached. Based on the lithology of boring MW-104, the <br /> screened intervals of the proposed additional wells are indicated in the well construction <br /> - table below: <br /> r <br /> --Well No. Dia./TD creen Slot Sand PackTrans-. rout ea <br /> Seal <br /> - - sand - - -sur ace <br /> 753 3 sand 46_-5T'__4_4_-4_6' -sur ace <br /> Mw-1 3 - san - _b - -sur ace <br /> san - - -sur ace <br /> - sand - - -sur ace <br /> The additional borings will be drilled in accordance with those procedures detailed in the <br /> "Soil & Groundwater Investigation Work Plan" prepared by Geological Technics Inc. on <br /> October 8, 2001. <br /> Additional Boring/Well Locations <br /> The locations of the proposed wells are as in the original work plan "Soil & Groundwater <br /> Investigation Work Plan."prepared by Geological Technics Inc. on October 8, 2001. See the � <br /> attached Figure 2 Site Map for the locations of wells MW-4, 401, -103, -105 and -106 <br /> • r <br /> i � <br />