Laserfiche WebLink
Geological Tecfmccs Inc page 15 <br /> ' Additional Site Characterization Report <br /> Project No 662 2 <br /> February 20,2004 <br /> 1 Continue performing quarterly groundwater monitoring and include the new wells in <br /> the current schedule <br /> ' In their November 18, 2002 letter correspondence, SJC/EHD called for phased approach to <br /> continue the site investigation The phased approached consists of cone penetrometer <br /> ' testing (CPT), followed by monitoring well installation and groundwater extraction well <br /> installation, and performing an aquifer test With the CPT work now completed, GTI will <br /> ' prepare a work plan for the installation of additional monitoring and extraction wells, the <br /> dual phase extraction pilot test and submit the plan to SJC/EHD for approval <br /> ' 6.0 LIMITATIONS <br /> ' This report was prepared in accordance with the generally accepted standard of care and <br /> practice in effect at the time Services were rendered It should be recognized that definition <br /> and evaluation of environmental conditions is an inexact science and that the state or <br /> ' practice of environmental geology/hydrology is changing and evolving and that standards <br /> existing at the present time may change as knowledge increases and the state of the practice <br /> continues to improve Further, that differing subsurface soil characteristics can be <br /> experienced within a small distance and therefore cannot be known in an absolute sense <br /> All conclusions and recommendations are based on the available data and information. <br /> ' The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law No warranty, expressed or implied, is <br /> made <br /> 1 <br />