Laserfiche WebLink
SW N./ <br /> INTRODUCTION <br /> A Site Safety Plan (SSP) has been designed to address safety provisions needed during the site <br /> soil/groundwater assessment. Its purpose is to provide established procedures to protect all on-site <br /> personnel from physical hazards and from chemical hazards resulting from direct skin contact, <br /> inhalation, or ingestion of potentially hazardous materials that may be encountered at the site. <br /> The SSP establishes personnel responsibilities, personal protective equipment standards, <br /> decontamination procedures, and emergency action plans. This SSP has been prepared in <br /> accordance with applicable state and federal laws. <br /> Park Environmental Corporation (Park) seeks to enter the property previously described for <br /> the purpose of conducting a soil assessment consisting of drilling soil borings to assess soil quality <br /> beneath the site. <br /> This SSP describes means for protecting all on-site personnel from deleterious contamination or <br /> personal injury while conducting on-site activities. <br /> SITE BACKGROUND <br /> This property is located at 224 North Main Street in Lodi, California. The principal chemical <br /> constituent alleged on site are petroleum hydrocarbons and total lead. <br /> PURPOSE AND LIST OF PLANNED ACTIVITIES <br /> The scope of work was developed to investigate the extent of petroleum hydrocarbons in soil. The <br /> following activities are planned to accomplish this objective. <br /> • Drilling one soil boring and collecting relatively undisturbed soil <br /> samples for chemical and physical analyses. <br /> RESPONSIBILITIES OF KEY PERSONNEL <br /> All personnel on-site will have assigned responsibilities. Park's Project Geologist will serve as <br /> Site Safety Officer (SSO) and will assure that all on-site personnel have received a copy of SSP. <br /> Park's Project Geologist will also be responsible for keeping field notes, collecting and securing <br /> samples, and assuring sample integrity by adherence to chain of custody protocol. All personnel <br /> will be required to document their full understanding of the SSP before admission to the site. <br /> Compliance with SSP will be monitored at all times by the SSO. Provisions of this SSP are <br /> mandatory and all personnel associated with on-site activities will adhere strictly hereto. <br /> Appropriate personal protective equipment, listed below, will be available and utilized by all on- <br /> site personnel. Prior to beginning work, the SSO will conduct a training session to assure that <br /> all are aware of safe work practices. In the training session, personnel will be made aware of <br /> hazards at the site and may utilize Material Safety Data Sheets for information on compounds to <br />