My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 4:58:04 PM
Creation date
3/5/2020 4:22:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ia <br /> E <br /> Field Practices and Procedures <br /> Page 5 <br /> f retracted from the hole. Continuous grouting will prevent cross contamination of water <br /> bearing zones that can occur through an open borehole. The boring will be backfilled to <br /> surface grade. An asphalt patch will be placed over the borehole. <br /> Direct Push Technology, Water Sampling <br /> A well known example of direct push technology for water sampling is the Hydropuncho. <br /> For the purpose of this field method the term hydropunch will be used instead of direct <br /> push technology for water sampling. <br /> The hydropunch is typically used with a drill rig. A boring is drilled with hollow stem- <br /> augers to just above the sampling zone. In some soil conditions the drill rig can push <br /> directly from the surface to the sampling interval. The hydropunch is conveyed to the <br /> bottom of the boring using drill rods. Once on bottom the hydropunch is driven a <br /> maximum of five feet. The tool is then opened by lifting up the drill rod no more than <br /> four feet. Once the tool is opened, water enters and a sample can be collected with a <br /> bailer or tubing utilizing a peristaltic pump. Soil particles larger than silt are prevented <br /> from entering the tool by a screen within the tool. The water sample is collected, labeled, <br /> and handled according to the Quality Assurance Plan. <br /> 1 <br /> ' I <br /> M:1Field PracticesWield P and P with CPT for Joes-revised 07-2004 by SJC.doc <br /> l <br /> _1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.