Laserfiche WebLink
TABLE 3 <br /> OPERATIONAL UPTIME AND FLOW RATE <br /> • FOR SOIL VAPOR EXTRACTION SYSTEM <br /> USA Gasoline Station 65 <br /> 2500 West Lodi Avenue <br /> Lodi, California <br /> Date Hr Meter Flow Rate vacc-urrij Das Between Sampling Dates Cumulative Das Percent <br /> Reading (cfm) ("WC) Total Days Uptime Total Days Uptime Uptime <br /> 10/20/2004 System start-up under new SJVAPCD Permit N-4887-2-0 The new Solleco 100 cfm SVE system consists of <br /> 5 hp blower and a electric catalytic oxidizer <br /> 10/20/2004 09 4365 136 -- -- -- <br /> 10/28/2004 1903 420 204 800 789 800 789 9865% <br /> 11/4/2004 358 890 408 70 70 150 1488 99 82% <br /> 11/23/2004 8156 81 0 272 190 191 340 3395 100% <br /> 12/9/2004 1 1,204 1 800 NM 160 162 500 50 13 100% <br /> 12/24/20041 1,561 2 820 30 150 149 650 6501 99% <br /> 1/13/2005 2,0432 873 NM 200 20 1 850 85 10 100% <br /> 1/25/2005 NM 750 NM -- -- -- -- -- <br /> 2/8/2005° 2,4770 873 544 260 18 1 1110 103 17 70% <br /> 2/24/2005 2,8623 873 544 160 16 1 1270 11923 100% <br /> 3/3/2005 3,0323 982 95 2 70 7 1 1340 12631 100% <br /> 3/17/2005 3,365 1 770 680 140 139 1480 140 18 99% <br /> • * System Shutdown for pulsing ` System down due to Power Outage <br /> "WC-Inches Water Column 2 System observed to be non-functional upon arrival at the site, <br /> M-Not Measured however upon re-start functioned normally The SVE system was <br /> shutdown due to low influent concentrations <br /> 3SVE system shut down due to carbon breakthrough <br /> 4Total days between sampling dates estimated here is between <br /> 1/13/5 and 2/8/5 <br /> USA_65_Quarur1y_MM Page 3 of 3 STRATU5 <br />