Laserfiche WebLink
2004 The 150 cfm Stealth Bobcat SVE system operated at the site for a total of 13,624 hours and <br /> removed approximately 3,467 pounds of TPHG and the carbon adsorption system has operated at the site <br /> ifor a total of 2,124 hours and removed approximately 33 53 pounds of TPHG The tabulated summaries <br /> Of performance of previously operated SVE systems are included in Appendix D <br /> SVE System Operation and Maintenance <br /> Stratus conducted seven site visits during the first quarter 2005 to conduct operation and maintenance of <br /> the SVE system, and to collect compliance samples During the first quarter 2005, the SVE system has <br /> operated for approximately 1,803 9 hours at an average operational uptime of 93 9 percent The influent <br /> TPHG concentrations fluctuated from less than 50 mglm at the beginning of the quarter (January 13, <br /> 2005) to 40 Mg/M3 at the end of first quarter 2005 (March 3, 2005) The average Influent airflow rate to <br /> the SVE system was observed at 85 35 cfm at an average applied vacuum of 68 inches of water column <br /> Figure 4 presents change in Influent concentrations of TPHG and the cumulative TPHG mass removed as <br /> a result of soil vapor extraction During the first quarter 2005, approximately 40 83 pounds of TPHG was <br /> extracted and abated by the SVE system As of March 3, 2004, a total of 4,114 12 pounds of TPHG has <br /> been removed from the subsurface beneath the site The SVE system is operating as designed and is in <br /> compliance with the SJVAPCD permit requirements <br /> Due to low influent petroleum hydrocarbon concentrations in the extracted sod vapor stream and high <br /> energy costs, Stratus will operate the SVE system in pulse mode The SVE system will be operated for <br /> 15-days per month beginning second quarter 2005 <br /> ATTACHMENTS <br /> • Table 1 Groundwater Elevation and Analytical Summary <br /> • Table 2 Groundwater Analytical Results for Oxygenates <br /> • Table 3 Operational Uptime and Flow Rate <br /> • Table 4 Flow Rates and Analytical Results of Air Sample Analysis <br /> Table 5 Extraction and Emission Rates <br /> • Figure 1 Site Location Map <br /> • Figure 2 Groundwater Elevation Contour Map (First Quarter 2005) <br /> • Figure 3 Groundwater Analytical Summary (First Quarter 2005) <br /> • Figure 4 Cumulative Mass Removed and Concentrations of TPHG Vs Time <br /> • Appendix A Field Data Sheets <br /> • Appendix B Sampling and Analysis Procedures <br /> • Appendix C Certified Analytical Reports and Chain-of-Custody Documentation <br /> • Appendix D Performance Summaries for Previous SVE Systems <br /> • <br /> 05 DOC STWATU5 <br /> K IDSA Gaso1me100651Qtr1y120051USA_65_I Q <br />