Rernedial activities at the site were initiated with a SVE system consisting of a 150 cfm Stealth Bobcat <br /> catalytic oxidizer (cat-ox) and was operated at the site between August 15, 2000 and August 15, 2002, <br /> under permit N-903-2-0 Due to low influent concentrations, the cat-ox system was replaced with a SVE <br /> System consisting of a 2 3 HP Fuji Blower and two 1,000 lbs vapor phase carbon units, which operated at <br /> the site between August 1, 2003 and March 12, 2004, under permit N-4887-1-0 The vapor phase carbon <br /> adsorption system was replaced with the currently operating Solleco 100 cfm electric cat-ox in October f <br /> 2004 The 150 cfm Stealth Bobcat SVE system operated at the site for a total of 13,624 hours and <br /> removed approximately 3,467 pounds of TPHG and the carbon adsorption system has operated at the site <br /> for a total of 2,124 hours and removed approximately 33 53 pounds of TPHG The tabulated summaries <br /> of peCformance of previously operated SVE systems are included in Appendix D <br /> SVE S stem O eration and Maintenance <br /> Stratus conducted eight site visits during the fourth quarter 2004 to construct, install and start-up the new <br /> Solleco 100 cfm SVE system, to conduct operation and maintenance of the SVE system, and to collect <br /> compliance samples Upon authorization from SJVAPCD, the Solleco 100 cfm SVE system was started <br /> on October 10, 2004, in the presence of SJVAPCD personnel The SVE system since the start-up has <br /> operated for approximately 1,561 hours at an average operational uptime of 99 5 percent <br /> The influent GRO concentrations fluctuated from 17,000 milligrams per cubic meter (Mg/M3) during the <br /> start-up (on October 20, 2004) to 56 mg/m3 at the end of fourth quarter 2004 (December 9, 2004) The s <br /> average influent airflow rate to the SVE system was observed at 69 61 cfm at an average applied vacuum <br /> of 26 40 inches of water column Figure 4 presents change in influent concentrations of GRO and the <br /> cumulative GRO mass removed as a result of soil vapor extraction During the fourth quarter 2004, <br /> approximately 569 33 pounds of GRO was extracted and abated by the SVE system As of December 9, <br /> 2004, a total of 4,073 29 pounds of TPHG has been removed from the subsurface beneath the site The 5� <br /> SVE system is operating as designed and is in compliance with the SJVAPCD permit requirements <br /> . ATTACHMENTS <br /> • Table 1 Groundwater Elevation and Analytical Summary <br /> • Table 2 Groundwater Analytical Results for Oxygenates <br /> • Table 3 Operational Uptime and Flow Rate <br /> • Table 4 Flow Rates and Analytical Results of Air Sample Analysis <br /> • Table 5 Extraction and Emission Rates <br /> • Figure 1 Site Location Map <br /> • Figure 2 Groundwater Elevation Contour Map (Fourth Quarter 2004) <br /> • Figure 3 Groundwater Analytical Summary (Fourth Quarter 2004) <br /> • Figure 4 Cumulative Mass Removed and Concentrations of TPHG Vs Time <br /> • Appendix A Field Data Sheets <br /> • Appendix B Sampling and Analysis Procedures <br /> • Appendix C Certified Analytical Reports and Chain-of-Custody Documentation <br /> • Appendix D Performance Summaries for Previous SVE Systems <br /> K\USA Gasoiine10065\Qtrly\2004\USA_65_4Q04 DOC 5rRATU5 <br />